Influence of Metro Vehicle Operation on Adjacent High-Speed Railway Bridge Pier

被引:1
|
作者
Cheng, Guohui [1 ,2 ]
Shan, Yao [1 ,2 ]
Zhou, Xiangliang [1 ,2 ]
机构
[1] Tongji Univ, Shanghai Key Lab Rail Infrastruct Durabil & Syst, Shanghai, Peoples R China
[2] Tongji Univ, Key Lab Rd & Traff Engn, Minist Educ, Shanghai, Peoples R China
来源
ADVANCES IN TRANSPORTATION GEOTECHNICS IV, VOL 3 | 2022年 / 166卷
基金
中国国家自然科学基金;
关键词
Vibration isolation; Isolation piles; Finite element; PILES; BARRIERS;
D O I
10.1007/978-3-030-77238-3_72
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The growing scale of the high-speed railway network and that of the metro leads to an increasing number of intersections between these two traffic modes. To ensure the structural safety during the construction process of metro tunnels constructed beneath existing high-speed elevated lines, rows of isolation piles between these two different kinds of traffic infrastructures have been widely utilized. However, the vibration isolation effect of these piles during the metro vehicle operation process is still not well studied. In this paper, a model that accounts for the interaction between structures (i.e., high-speed bridge, isolation piles and metro tunnels) and soil foundations is established by employing a three-dimensional finite element method to investigate the vibration isolation effect of the isolation piles. The influence of different design parameters of isolation piles on the vibration characteristics of the complete system is investigated. Besides, this paper summarizes the law of wave peaks formation in the vibration magnification area. The results show that: (i) For surface, vibration isolation effect is influenced greatly by the spacing and diameter of isolation piles. The vibration isolation effect of the isolation pile is weakened considerably with increasing pile net spacing and is enhanced with increasing pile diameter. (ii) For high-speed bridge pier top, geometric parameters of isolation piles have little effect on the isolation efficiency. (iii) The increase of pile diameter and spacing makes wave peaks appear easily in the vibration magnifications region.
引用
收藏
页码:963 / 974
页数:12
相关论文
共 50 条
  • [11] Integral Bridge for High-Speed Railway
    Rodriguez, Javier
    Martinez, Francisco
    Marti, Joaquin
    STRUCTURAL ENGINEERING INTERNATIONAL, 2011, 21 (03) : 297 - 303
  • [12] Modeling the cumulative residual deformation of high-speed railway bridge pier subjected to multiple earthquakes
    Gou, Hongye
    Leng, Dan
    Yang, Longcheng
    Jia, Hongyu
    EARTHQUAKES AND STRUCTURES, 2019, 17 (03) : 317 - 327
  • [13] Research on dynamic behavior of high-speed railway bridge piers under impact at pier top
    Meng, Dongliang
    Hu, Renkang
    Yang, Menggang
    He, Xuhui
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2024, 57 (12): : 54 - 67
  • [14] Characteristics of seismic response of high-speed railway frame pier-bridge-track system
    Yan B.
    Kuang W.
    Yu L.
    Zhu Z.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2023, 54 (09): : 3544 - 3550
  • [15] Displacement-Based Seismic Design for High-Speed Railway Bridge pier in Seismic Regions
    Chen, Lingkun
    Jiang, Lizhong
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2012, 15 (11A): : 4709 - 4714
  • [16] Effect of Long-Term Bridge Deformations on Safe Operation of High-Speed Railway and Vibration of Vehicle-Bridge Coupled System
    Gou, Hongye
    Yang, Longcheng
    Mo, Zhixiang
    Guo, Wei
    Shi, Xiaoyu
    Bao, Yi
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2019, 19 (09)
  • [18] Analysis and design of hybrid frame pier for high-speed railway
    Hu, N.
    Dai, G. L.
    STRUCTURES AND ARCHITECTURE, 2010, : 1408 - 1416
  • [19] A Settlement Curve Prediction Method of High-speed Railway Bridge Pier Based on RLM-MC
    Gong X.
    Wang H.
    Lu T.
    You W.
    Tiedao Xuebao/Journal of the China Railway Society, 2022, 44 (10): : 142 - 149
  • [20] Monitoring-Based Assessment of the Construction Influence of Benoto Pile on Adjacent High-Speed Railway Bridge: Case Study
    Zhang, Y. M.
    Wang, H.
    Mao, J. X.
    Wang, F. Q.
    Hu, S. T.
    Zhao, X. X.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2019, 33 (01)