Scheduling flexible manufacturing cell with no-idle flow-lines and job-shop via Q-learning-based genetic algorithm

被引:29
|
作者
Cheng, Lixin [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
Zhang, Liping [1 ,2 ]
Yu, Chunlong [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment, Control Technol Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Flexible manufacturing cell; Cell scheduling; Flow production; Job production; Genetic algorithm; Q-learning; SYSTEM; OPTIMIZATION; DESIGN; PARTS;
D O I
10.1016/j.cie.2022.108293
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Owing to enormous varieties in product quantities and types in customer orders, two production methods, flow production and job production, should be simultaneously carried out in the flexible manufacturing cell so that standardized products in high volume and individualized products in low volume can be compatibly manufactured. Thus, this work schedules such a realistic manufacturing cell with these two production methods. A mixed integer linear programming model is developed to determine cell formation and machine assignment, and particularly to locally sequence standardized products within each product family and globally schedule all individualized products and product families. Meanwhile, a Q-learning-based genetic algorithm (Q-GA) is proposed to solve large-scaled cases effectively and efficiently. In Q-GA, a rule-based initialization improves the quality of initial solutions; a forward and no-idle backward decoding mechanism satisfies the job availability, machine availability and no-idle time constraints; a Q-learning-based approach adaptively controls the crossover/mutation rates to lower relative percentage deviation. Experimental results demonstrate that for the flexible manufacturing cell scheduling problem with two production methods, the proposed Q-GA obtains the lower bounds of small-scaled cases and outperforms the comparison algorithms for large-scaled cases in the solution effectiveness and robustness.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] Research on flexible job-shop scheduling problem in green sustainable manufacturing based on learning effect
    Peng, Zhao
    Zhang, Huan
    Tang, Hongtao
    Feng, Yue
    Yin, Weiming
    JOURNAL OF INTELLIGENT MANUFACTURING, 2022, 33 (06) : 1725 - 1746
  • [42] Scheduling of a flexible job-shop using a multi-objective genetic algorithm
    Agrawal, Rajeev
    Pattanaik, L. N.
    Kumar, S.
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2012, 9 (02) : 178 - 188
  • [43] AN IMPROVED GENETIC ALGORITHM FOR RESOURCE-CONSTRAINED FLEXIBLE JOB-SHOP SCHEDULING
    Wei, F. F.
    Cao, C. Y.
    Zhang, H. P.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2021, 20 (01) : 201 - 211
  • [44] Unified Genetic Algorithm Approach for Solving Flexible Job-Shop Scheduling Problem
    Park, Jin-Sung
    Ng, Huey-Yuen
    Chua, Tay-Jin
    Ng, Yen-Ting
    Kim, Jun-Woo
    APPLIED SCIENCES-BASEL, 2021, 11 (14):
  • [45] The Improved Simulated Annealing Genetic Algorithm for Flexible Job-Shop Scheduling Problem
    Gu, Xiaolin
    Huang, Ming
    Liang, Xu
    PROCEEDINGS OF 2017 6TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT 2017), 2017, : 22 - 27
  • [46] An Efficient Two-Stage Genetic Algorithm for Flexible Job-Shop Scheduling
    Rooyani, Danial
    Defersha, Fantahun M.
    IFAC PAPERSONLINE, 2019, 52 (13): : 2519 - 2524
  • [47] Modular design of a hybrid genetic algorithm for a flexible job-shop scheduling problem
    Gutierrez, Celia
    Garcia-Magarino, Ivan
    KNOWLEDGE-BASED SYSTEMS, 2011, 24 (01) : 102 - 112
  • [48] Multi objective flexible job-shop scheduling based on immune algorithm
    Yu, Jian-Jun
    Sun, Shu-Dong
    Hao, Jing-Hui
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (10): : 1643 - 1650
  • [49] FLEXIBLE JOB-SHOP SCHEDULING PROBLEM BASED ON HYBRID ACO ALGORITHM
    Wu, J.
    Wu, G. D.
    Wang, J. J.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (03) : 497 - 505
  • [50] Hybrid Genetic Algorithm with Priority Rule-based Reconstruction for Flexible Job-shop Scheduling
    Yokoyama, Soichiro
    Iizuka, Hiroyuki
    Yamamoto, Masahito
    2014 JOINT 7TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING AND INTELLIGENT SYSTEMS (SCIS) AND 15TH INTERNATIONAL SYMPOSIUM ON ADVANCED INTELLIGENT SYSTEMS (ISIS), 2014, : 749 - 754