Assembly phase estimation in the square peg assembly process

被引:0
|
作者
Park, Dong Il [1 ]
Park, Chanhun [1 ]
Do, Hyunmin [1 ]
Choi, Taeyong [1 ]
Kyung, Jin-Ho [1 ]
机构
[1] Korea Inst Machinery & Mat, Dept Robot & Mechatron, Taejon 305343, South Korea
关键词
Square peg-in hole; Contact phase; Contact state; FT sensor;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Almost industrial robot arms have been used in the simple repetitive process such as handling, transferring and assembling the simple workpiece with large tolerance. Nowadays, industrial robots are necessary to apply to the high precise machining process and the high precise assembly process according to the change of automatic manufacturing system. For the high precise assembly process using robot system, assembly strategy and assembly phase estimation are very important in addition to the performance of the robot arm mechanism and robot control algorithm. Vision system and torque sensor are generally used to estimate the contact phase. In the paper, several contact phases in the square peg in hole process are proposed and analyzed using FT sensor. The assembly experiment is carried out using this contact phase estimation and robot shows the successful square peg-in-hoe assembly.
引用
收藏
页码:2135 / 2138
页数:4
相关论文
共 50 条
  • [31] Detection and estimation of mental fatigue in manual assembly process of complex products
    Xiao, Hong
    Duan, Yugang
    Zhang, Zhongbo
    Li, Ming
    ASSEMBLY AUTOMATION, 2018, 38 (02) : 239 - 247
  • [32] Estimation of the resource buffers in the assembly process of a shearer machine in the CPPM method
    Gwiazda, Aleksander
    Paprocka, Iwona
    Baczkowicz, Magdalena
    4TH INTERNATIONAL CONFERENCE ON COMPUTING AND SOLUTIONS IN MANUFACTURING ENGINEERING 2016 - COSME'16, 2017, 94
  • [33] Object-oriented Assembly and Assembly Design Process Modeling
    Gui, Jin Kang
    JOURNAL OF ENGINEERING DESIGN, 1991, 2 (02) : 141 - 149
  • [34] A Virtual Assembly Process Simulation Method Based on Assembly Semantics
    Liu S.
    Wu L.
    Liu J.
    Du Z.
    Ma J.
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2021, 41 (01): : 37 - 42
  • [35] Yield estimation for BGA assembly
    Phadnis, SS
    Srihari, K
    Yamunan, V
    PROCEEDINGS OF THE 4TH ELECTRONICS PACKAGING TECHNOLOGY CONFERENCE (EPTC 2002), 2002, : 206 - 211
  • [36] Computer Aided Generation the Assembly Process Files for Virtual Assembly
    Zhang, Xianghua
    Dai, Guohong
    Xie, Feng
    Dong, Xiaoying
    ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION III, PTS 1 AND 2, 2012, 201-202 : 1008 - +
  • [37] Self-assembly into square lamellar structures
    不详
    ADVANCED MATERIALS, 2008, 20 (15) : A5 - A5
  • [38] Species assembly in model ecosystems, II: Results of the assembly process
    Capitan, Jose A.
    Cuesta, Jose A.
    Bascompte, Jordi
    JOURNAL OF THEORETICAL BIOLOGY, 2011, 269 (01) : 344 - 355
  • [39] Dynamic assembly simplification for virtual assembly process of complex product
    Xiao, Hong
    Li, Yuan
    Yu, Jian-Feng
    Cheng, Hui
    ASSEMBLY AUTOMATION, 2014, 34 (01) : 1 - 15
  • [40] Assembly process and assembly control development - a holistic and consistent approach
    Inst. Mach. Tools and Indust. Mgmt., TU München, Garching, Germany
    CIRP Ann Manuf Technol, 1 (25-28):