Investigating the Role of BIM in Stakeholder Management: Evidence from a Metro-Rail Project

被引:33
|
作者
Gaur, Sulakshya [1 ]
Tawalare, Abhay [1 ]
机构
[1] Visvesvaraya Natl Inst Technol, Dept Civil Engn, Nagpur 440010, Maharashtra, India
关键词
Stakeholder management (SM); Building information modeling (BIM); Megaproject; Construction project; Conceptual model; CRITICAL SUCCESS FACTORS; CONSTRUCTION; IMPLEMENTATION; BENEFITS; TRANSPARENCY; PERFORMANCE; STRATEGIES; ADOPTION; IMPROVE; RISKS;
D O I
10.1061/(ASCE)ME.1943-5479.0000979
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Building information modeling (BIM) is a technology that promotes increased levels of collaboration among teams involved in projects. This research work aims to map the advantages of BIM with the various stakeholder management (SM) practices being adopted. Through semistructured interviews with project personnel on a metro-rail project, 17 advantages of BIM were coded. These were grouped under five constructs: (1) asset tagging, (2) design optimization, (3) progress monitoring, (4) quick decision-making, and (5) cost monitoring and control. Additionally, 21 SM strategies were determined from the literature, which was analyzed using micro-interlocutor analysis (MIA). These were grouped under three groups and represented pillars of the SM process. These BIM advantages were then mapped with the three SM principles, i.e., stakeholder communication and collaboration, engagement, and satisfaction, which resulted in the generation of a conceptual BIM-SM model. The findings of this study revealed major implications and benefits of BIM adoption in a mega construction project in India and presented an important aspect of the role it can play in achieving better SM.
引用
收藏
页数:11
相关论文
共 50 条
  • [31] Complementarities Between Stakeholder Management and Participative Management: Evidence From the Youth Care Sector
    Fassin, Yves
    Deprez, Jolien
    Van den Abeele, Annelien
    Heene, Aime
    NONPROFIT AND VOLUNTARY SECTOR QUARTERLY, 2017, 46 (03) : 586 - 606
  • [32] Stakeholder involvement in Human Resource Management practices: Evidence from Italy
    Guerci, Marco
    Shani, Abraham B. Rami
    MANAGEMENT REVUE, 2014, 25 (02) : 80 - 102
  • [33] Role of awareness in strengthening the relationship between stakeholder management and project success in the construction industry of Pakistan
    Saad, Abdul
    Zahid, Sardar Muhammad
    Bin Muhammad, Usman
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (10) : 1884 - 1893
  • [34] BIM for Improved Project Communication Networks: Empirical Evidence from Email Logs
    Du, Jing
    Zhao, Dong
    Issa, Raja R. A.
    Singh, Nishith
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (05)
  • [35] The management of excavated materials from the Lyon-Turin rail link project
    Burdin, Jacques
    Monin, Nathalie
    Geomechanik und Tunnelbau, 2009, 2 (05): : 652 - 662
  • [36] The Role of Stakeholder Involvement in the Governance of Tourist Museums: Evidence of Management Models in the Canary Islands
    Moreno Mendoza, Hector
    Santana Talavera, Agustin
    Leon, Carmelo J.
    HERITAGE AND SOCIETY, 2018, 11 (03): : 229 - 248
  • [37] Role of BIM and 3D Laser Scanning on Job Sites from the Perspective of Construction Project Management Personnel
    Alomari, Kasim
    Gambatese, John
    Olsen, Michael J.
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2532 - 2541
  • [38] Willingness to Pay For Improved Watershed Management: Evidence From Metro Manila, Philippines
    Calderon, Margaret M.
    Camacho, Leni D.
    Carandang, Myrna G.
    Dizon, Josefina T.
    Rebugio, Lucrecio L.
    Tolentino, Noel L.
    FOREST SCIENCE AND TECHNOLOGY, 2006, 2 (01) : 42 - 50
  • [39] Engineering Education Professional Certification from a Project Management Perspective -Team and Stakeholder Analysis
    Xiang, Cheng
    Lin, Lianbing
    Gao, Chuanzhu
    Song, Xi
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL SEMINAR ON EDUCATION INNOVATION AND ECONOMIC MANAGEMENT (SEIEM 2017), 2017, 156 : 334 - 338
  • [40] Urban Metro Rail Demand: Evidence from Dynamic Generalized Method of Moments Estimates using Panel Data
    Canavan, Shane
    Graham, Daniel J.
    Anderson, Richard J.
    Barron, Alexander
    TRANSPORTATION RESEARCH RECORD, 2018, 2672 (08) : 288 - 296