Project Interface Management Evaluation for Construction Enterprise

被引:0
|
作者
Kong Fanfeng [1 ]
Lu Huimin [1 ]
机构
[1] SE Univ China, Dept Construct Management & Real Estate, Sch Civil Engn, Nanjing 210096, Jiangsu, Peoples R China
关键词
Interface management; Performance evaluation; Balanced Scorecard; Value engineering;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Dased on the definition of interface management, the paper proposed the necessity of interface management performance evaluation, researched the implementation of the specific activities, such as process of physical, organizational and contractual aspects of project interface management, in order to find out the management activities' contribution degree to the achievement of the project, then try to identify the interface management's input and output efficiency, put forward improvement proposal to management activities and strengthen the control of interfaces. Applied Balanced Scorecard principle to summarize the performance in finacial, customers, internal business process, learning and growth, the four indicators of interface management evaluation. Methods and usage of value engineering in interface management performance evaluation was discussed, then the importance of four aspects of the Balanced Scorecard were delivered to the real significant management activities which all included in the physical, contractual and organzational interface management. At last, this method was illustrated by example analysis.
引用
收藏
页码:2000 / 2005
页数:6
相关论文
共 50 条
  • [1] Management on the "interface" of construction project
    Wang, Yajun
    [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 201 - 203
  • [2] Study to the Performance Evaluation of Construction Enterprise Project Management based on the BSC
    Xu Bing
    Yu Hao
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II, 2008, : 242 - 246
  • [3] Management Research on the Construction Enterprise Project Cost
    Zhang, Hai Yan
    Zhao, Jin Wei
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2193 - +
  • [4] Knowledge management of construction enterprise based on circumstances of project
    Gao, Ninan
    Wang, Yaowu
    [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 899 - 901
  • [5] The Research on Target Cost Management of Construction Enterprise Project
    Xu, Hui
    [J]. 2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL III, 2011, : 137 - 140
  • [6] Research on Regionalization of Project Management Based on the Construction Enterprise
    Zhanglu
    [J]. CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 3171 - 3175
  • [7] Discussions of Strategic Implementation of Construction Enterprise in Project Management
    Wang Lifei
    Cheng Hu
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 244 - 248
  • [8] Research on Comprehensive Evaluation Index System of Organization Interface Management of Construction Project
    Li Junhui
    Guo Haibin
    [J]. PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM - MANAGEMENT SCIENCES AND ENGINEERING, 2011, : 3 - 8
  • [9] Research on the construction of an enterprise management evaluation system
    Gao, Jie
    [J]. BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 127 : 255 - 255
  • [10] Applied Research on the Enterprise-level Project Management System and Information Construction of Project General Contractor Enterprise
    Zhang Jianwei
    Zhu Minjie
    Zhang Liwei
    [J]. ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2337 - +