A REFERENCE MODEL IN BPMN FOR CONCEPTUAL MODELLING OF MASTER PLANNING SCHEDULE

被引:0
|
作者
Entringer, Tulio Cremonini [1 ]
Ferreira, Ailton da Silva [2 ]
机构
[1] Univ Estadual Norte Fluminense, Campos Dos Goytacazes, Brazil
[2] Univ Fed Fluminense, Niteroi, RJ, Brazil
来源
关键词
Reference Model; Production Planning and Control; Master Production Schedule; BPMN; PERSPECTIVES;
D O I
10.14807/ijmp.v11i2.1067
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Companies are progressively investing in practices aimed at improving the quality of management, with the main purpose of enabling them to operate competitively in the present market. For this, it is necessary to document the activities and information of the existing business processes in the organization, aiming at reducing time and cost in the elaboration of the particular model. In this context, the objective of this work is to develop a reference model of the Master Production Schedule (MPS) processes, an important module of production planning and control (PPC). The research methodology used in this work was divided into the following stages: study of MPS and business process modeling, definition of reference model processes, choice of methodology and process modeling tool, development of reference model and prototype of the software and, finally, analysis of results. The modeling notation used was the BPMN, since it is considered a standard language in the field of process modeling. The prototype was developed through the Delphi interface in order to apply the model to support the implementation of business management programs. As results, from a formal documentation, the model proved to be a useful mechanism in the understanding of the processes raised and appropriate in the support to the implantation of production management tools.
引用
收藏
页码:394 / 418
页数:25
相关论文
共 50 条
  • [41] Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems
    Zhao, XD
    Xie, JX
    PRODUCTION PLANNING & CONTROL, 1998, 9 (04) : 371 - 384
  • [42] Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems
    Zhao, Xiande
    Xie, Jinxing
    Production Planning and Control, 1998, 9 (04): : 371 - 384
  • [43] On the new conceptual model of the bibliographic universe: the FRBR Library Reference Model
    Riva, Pat
    AIB STUDI, 2016, 56 (02): : 265 - 274
  • [44] Toward a functional reference model for master data quality management
    Otto, Boris
    Huener, Kai M.
    Oesterle, Hubert
    INFORMATION SYSTEMS AND E-BUSINESS MANAGEMENT, 2012, 10 (03) : 395 - 425
  • [45] The ESA MASTER '99 space debris and meteoroid reference model
    Sdunnus, H
    Bendisch, J
    Klinkrad, H
    PROCEEDINGS OF THE THIRD EUROPEAN CONFERENCE ON SPACE DEBRIS, VOLS 1 AND 2, 2001, 473 : 299 - 307
  • [46] Toward a functional reference model for master data quality management
    Boris Otto
    Kai M. Hüner
    Hubert Österle
    Information Systems and e-Business Management, 2012, 10 : 395 - 425
  • [47] A generic model for 3-dimensional conceptual modelling
    Creasy, PN
    Proper, HA
    DATA & KNOWLEDGE ENGINEERING, 1996, 20 (02) : 119 - 161
  • [48] Conceptual model of risk: Towards a risk modelling language
    Sienou, Amadou
    Lamine, Elyes
    Karduck, Achim
    Pingaud, Herve
    WEB INFORMATION SYSTEMS ENGINEERING - WISE 2007 WORKSHOPS, 2007, 4832 : 118 - +
  • [49] A conceptual model for laboratory ventilation greenhouse gas planning
    Posner, Stephen
    Stuart, Ralph
    Thompson, Gioia
    JOURNAL OF CHEMICAL HEALTH & SAFETY, 2011, 18 (05): : 34 - 42
  • [50] A CONCEPTUAL-MODEL FOR THE INSTRUCTION AND SUPERVISION OF TREATMENT PLANNING
    PELLAND, MJ
    AMERICAN JOURNAL OF OCCUPATIONAL THERAPY, 1987, 41 (06): : 351 - 359