Monitoring the deformations of embankment dams during construction a case study: Panzdah Khordad dam

被引:0
|
作者
Yasrebi, SH [1 ]
Bagherieh, AR [1 ]
机构
[1] Tarbiat Modarres Univ, Dept Civil Engn, Tehran, Iran
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In this study the monitored data of instruments installed in Panzdah Khordad dam is analyzed. Internal deformations have been compared with predicted values during design and back analysis results. To do back analyses, CA2 code is used. The multi layer construction of dam is modeled by effective stress method and two dimensional consolidation analysis. The constitutive model which is used is Mohr-Coulomb's Elastic perfectly plastic model. The measured internal deformations are greater than that obtained from design parameters of fill materials; Material parameters are corrected. The corrected values of modulus of elasticity are more than three times their values in design stage. Correcting modulus of elasticity, pore water pressures and settlements become closer to the measured values.
引用
收藏
页码:771 / 773
页数:3
相关论文
共 50 条
  • [1] OBSERVED AND PREDICTED DEFORMATIONS IN A LARGE EMBANKMENT DAM DURING CONSTRUCTION
    PENMAN, ADM
    HUMPHREY.JD
    JOLLANS, WN
    SMITH, IM
    WINDER, AJH
    SAVAGE, RJ
    BURLAND, JB
    CARLYLE, WJ
    CHARLES, JA
    BROMHEAD, E
    BISHOP, AW
    HAWES, ET
    CHOWDHUR.RN
    NAYLOR, DJ
    GIBSON, RE
    PYRAH, IC
    KENNARD, MF
    LITTLE, AL
    LOW, WI
    GOSSCHAL.EM
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1972, 51 (APR): : 729 - &
  • [2] OBSERVED AND PREDICTED DEFORMATIONS IN A LARGE EMBANKMENT DAM DURING CONSTRUCTION
    PENMAN, ADM
    BURLAND, JB
    CHARLES, JA
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1971, 49 (MAY): : 1 - &
  • [3] Numerical analysis and monitoring of an embankment dam during construction and first impounding Case study: Siah Sang Dam
    Rashidi, M.
    Heidari, M.
    Azizyan, Gh.
    [J]. SCIENTIA IRANICA, 2018, 25 (02) : 505 - 516
  • [4] Permeability change driving effect on embankment dams Case Study:The Zonouz embankment dam
    Nourani, V.
    Nobarian, B. Fatehi
    [J]. PROCEEDINGS OF THE 5TH IASME/WSEAS INT CONF ON WATER RESOURCES, HYDRAULICS & HYDROLOGY/PROCEEDINGS OF THE 4TH IASME/WSEAS INT CONF ON GEOLOGY AND SEISMOLOGY: WATER AND GEOSCIENCE, 2010, : 47 - +
  • [5] A case study on asphalt core construction rate for the Zhaobishan embankment dam
    Wang, Weibiao
    Hu, Kai
    Feng, Shan
    Zhao, Ran
    [J]. CASE STUDIES IN CONSTRUCTION MATERIALS, 2020, 13
  • [6] Rapid Compaction Monitoring and Quality Control of Embankment Dam Construction Based on UAV Photogrammetry Technology: A Case Study
    Yin, Han
    Tan, Chun
    Zhang, Wen
    Cao, Chen
    Xu, Xinchuan
    Wang, Jia
    Chen, Junqi
    [J]. REMOTE SENSING, 2023, 15 (04)
  • [7] Satellite remote sensing of UK embankment dams: influence of dam features on monitoring quality
    Shire T.
    Lawrence J.
    Agar S.
    Ghail R.
    Judge T.
    [J]. Dams and Reservoirs, 2022, 33 (02) : 71 - 81
  • [9] Treatment of a collapsible (Loess) foundation of an embankment dam during construction
    Oskoorouchi, AM
    Nezad, MD
    [J]. DEALING WITH AGING DAMS, 1999, : 143 - 162
  • [10] Study on the seepage monitoring theory with temperature in embankment dam
    Li Duan-you
    Xiong Jian
    Wang Huang
    [J]. DAMS AND RESERVOIRS, SOCIETIES AND ENVIRONMENT IN THE 21ST CENTURY, VOLS 1 AND 2, 2006, : 527 - +