共 50 条
- [24] Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money [J]. SYMMETRY-BASEL, 2021, 13 (12):
- [27] An exact algorithm for single-machine scheduling without machine idle time [J]. Journal of Scheduling, 2009, 12 : 575 - 593
- [30] A Single Machine Scheduling with Periodic Maintenance and Uncertain Processing Time [J]. International Journal of Computational Intelligence Systems, 2020, 13 : 193 - 200