Production scheduling;
lot-sizing;
dairy industry;
MILP model;
D O I:
暂无
中图分类号:
TQ [化学工业];
学科分类号:
0817 ;
摘要:
The lot-sizing and production scheduling problem in a real-life multi-product yoghurt production line is addressed. A new discrete/continuous time representation mixed-integer linear programming model, based on the definition of families of products, is presented. It is mainly optimized the packaging stage while timing and capacity constraints are imposed with respect to the pasteurization/homogenization and fermentation stage. Packaging units operate in parallel and may share common resources. Sequence-dependent times and costs are also explicitly taken into account. An industrial case study is presented wherein production bottlenecks are revealed and several retrofit design options are proposed to enhance the production capacity and flexibility of the plant.
机构:
Univ Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, SerbiaUniv Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, Serbia
Popovic, Drazen
Bjelic, Nenad
论文数: 0引用数: 0
h-index: 0
机构:
Univ Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, SerbiaUniv Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, Serbia
Bjelic, Nenad
Vidovic, Milorad
论文数: 0引用数: 0
h-index: 0
机构:
Univ Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, SerbiaUniv Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, Serbia
Vidovic, Milorad
Ratkovic, Branislava
论文数: 0引用数: 0
h-index: 0
机构:
Univ Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, SerbiaUniv Belgrade, Fac Transport & Traff Engn, Dept Logist, Belgrade 11000, Serbia