An integrated modeling approach for event sequence development in multi-unit probabilistic risk assessment

被引:28
|
作者
Zhang, Sai [1 ,2 ,3 ]
Tong, Jiejuan [1 ,2 ,3 ]
Zhao, Jun [1 ,2 ,3 ]
机构
[1] Tsinghua Univ, Inst Nucl & New Energy Technol, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Collaborat Innovat Ctr Adv Nucl Energy Technol, Beijing 100084, Peoples R China
[3] Minist Educ, Key Lab Adv Reactor Engn & Safety, Beijing 100084, Peoples R China
关键词
Nuclear power plant; Multi-unit site; Probabilistic risk assessment; High temperature gas cooled reactor; Intra and inter unit common cause failure; NUCLEAR-POWER-PLANT; GAS-COOLED REACTOR; SAFETY ASSESSMENT; SITES;
D O I
10.1016/j.ress.2016.07.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To obtain a complete site risk profile for multi-unit nuclear power plants (NPPs), the existing single-unit probabilistic risk assessment (PRA) model needs to be upgraded to address both intra-unit and inter-unit dependencies. The high temperature gas cooled reactor-pebble bed module (HTR-PM), with two reactor steam generator modules and one shared steam turbine-generator set, is a ready-in-hand pilot for multi-unit PRA (MUPRA) studies. In this paper, a general framework for MUPRA is firstly developed based on HTR-PM PRA methodology. An Integrated Modeling (IM) approach is then proposed for multi-unit event sequence modeling. The approach is discussed in detail and illustrated with a loss of offsite power (LOOP) case study. Also, the limitations of the current analysis are put forward for open discussion. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:147 / 159
页数:13
相关论文
共 50 条
  • [31] Integrated multi-objective predictive control for multi-unit system
    Ravi, Arvind
    Kaisare, Niket
    2019 SIXTH INDIAN CONTROL CONFERENCE (ICC), 2019, : 212 - 217
  • [32] An integrated approach for the probabilistic risk assessment of the Mars Relay Network
    Meshkat, Leila
    Girerd, Andre
    Edwards, Charles D.
    2006 PROCEEDINGS - ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, VOLS 1 AND 2, 2006, : 618 - +
  • [33] A general modeling method for opportunistic maintenance modeling of multi-unit systems
    Zhang, Xiaohong
    Zeng, Jianchao
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 140 : 176 - 190
  • [34] Multi-unit Level 3 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site
    Kim, Sung-Yeop
    Jung, Yong Hun
    Han, Sang Hoon
    Han, Seok-Jung
    Lim, Ho-Gon
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2018, 50 (08) : 1246 - 1254
  • [35] Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site
    Cho, Jaehyun
    Han, Sang Hoon
    Kim, Dong-San
    Lim, Ho-Gon
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2018, 50 (08) : 1234 - 1245
  • [36] PROBABILISTIC CASCADING EVENT RISK ASSESSMENT
    Koeck, Klaus
    Renner, Herwig
    Stadler, Josef
    2014 POWER SYSTEMS COMPUTATION CONFERENCE (PSCC), 2014,
  • [37] A rapid approach to generate multi-unit event trees based on tree combinatorial calculation1
    Peng, Pengcheng
    Tong, Jiejuan
    Zhao, Jun
    PROGRESS IN NUCLEAR ENERGY, 2023, 162
  • [38] Multi-unit risk aggregation with consideration of uncertainty and bias in risk metrics
    Zhou, Taotao
    Modarres, Mohammad
    Lopez Droguett, Enrique
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 188 : 473 - 482
  • [39] Exploring the Uncertainties in Cancer Risk Assessment Using the Integrated Probabilistic Risk Assessment (IPRA) Approach
    Slob, Wout
    Bakker, Martine I.
    te Biesebeek, Jan Dirk
    Bokkers, Bas G. H.
    RISK ANALYSIS, 2014, 34 (08) : 1401 - 1422
  • [40] Human Reliability Analysis in Probabilistic Safety Assessment of Multi-unit Nuclear Power Plants under External Impact
    Liu Dalin
    Wang Shuting
    Zhou Yiquan
    Yan Zhen
    Zhao Ling
    Wang Zhuangye
    2022 12TH INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS, ICPES, 2022, : 372 - 376