Bi-level programming for supplier selection under quantity discount policy

被引:6
|
作者
Zaheri, F. [1 ]
Zandieh, M. [2 ]
Taghavifard, M. T. [3 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Ind Engn, Tehran, Iran
[2] Shahid Beheshti Univ, Fac Management & Accounting, Dept Ind Management, Tehran, Iran
[3] Allameh Tabatabai Univ, Coll Management & Accounting, Tehran, Iran
关键词
Supply chain; Bi-level programming; Supplier selection; PSO; VOLUME DISCOUNT; CHAIN; COORDINATION; ALGORITHM; CONFLICT; DESIGN; SOLVE; MODEL;
D O I
10.24200/sci.2017.4297
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes two models to formulate a Supplier Selection Problem (SSP) in a single-buyer, multi-supplier two-echelon supply chain network. The model coordinates order allocation and supplier selection problems under all-unit quantity discount policy. In this way, bi-level programming is employed to obtain two models: 1) The model with buyer as a leader; 2) The model with vendor as a leader. The resulted nonlinear bi-level programming problems are hard to solve. Therefore, Particle Swarm Optimization (PSO) algorithm is used to deal with the complexity of the model and makes it solvable. Numerical results show that the proposed model is efficient for SSP in compliance with order allocation decision making. (C) 2017 Sharif University of Technology. All rights reserved.
引用
收藏
页码:2095 / 2104
页数:10
相关论文
共 50 条
  • [1] Research on quantity discount in sequential auctions based on bi-level programming
    [J]. Wang, X.-J., 1600, Systems Engineering Society of China (34):
  • [2] A bi-level programming model for green supplier selection and order allocation
    Sun, Xinyan
    Zhao, Qilan
    [J]. 2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [3] A general quantity discount and supplier selection mixed integer programming model
    Hartmut Stadtler
    [J]. OR Spectrum, 2007, 29 : 723 - 744
  • [4] A general quantity discount and supplier selection mixed integer programming model
    Stadtler, Hartmut
    [J]. OR SPECTRUM, 2007, 29 (04) : 723 - 744
  • [5] The Bi-level Programming Model between the Manufacture and the Supplier
    Hu Chang-ying
    [J]. 2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 362 - 367
  • [6] A Bi-level Programming Model to Solve Supplier Selection and Lot-Sizing Problem Addressing Quantity Discounts and Transportation Cost
    Zaheri, Fayegh
    Zandieh, Mostafa
    Taghavifard, Mohammad Taghi
    Najafi, Esmaeil
    [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2018, 17 (02): : 267 - 280
  • [7] Dynamic facility location with supplier selection under quantity discount
    Emirhuseyinoglu, Gorkem
    Ekici, Ali
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 134 : 64 - 74
  • [8] A bi-level programming model for supplier selection in constructing logistics service supply chain
    Guo, Mei
    Zhu, JinFu
    Zhao, XiuLi
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1614 - 1618
  • [9] A Bi-Level Programming Model for the Integrated Problem of Low Carbon Supplier Selection and Transportation
    Zhu, Hongli
    Liu, Congcong
    Song, Yongming
    [J]. SUSTAINABILITY, 2022, 14 (16)
  • [10] The Capacitated Supplier Selection problem with Total Quantity Discount policy and Activation Costs under uncertainty
    Manerba, Daniele
    Mansini, Renata
    Perboli, Guido
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 198 : 119 - 132