A Bi-Level Programming Model for the Integrated Problem of Low Carbon Supplier Selection and Transportation

被引:1
|
作者
Zhu, Hongli [1 ]
Liu, Congcong [2 ]
Song, Yongming [1 ]
机构
[1] Shandong Technol & Business Univ, Sch Business Adm, Yantai 264005, Peoples R China
[2] Shandong Univ, Sch Elect Engn, Jinan 250061, Peoples R China
关键词
bi-level programming; low carbon; integrated problem; FACILITY LOCATION; CONCRETE;
D O I
10.3390/su141610446
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper, we investigate an integrated problem of low-carbon supplier selection and transportation. The supplier selection decision depends on the location and energy consumption level of batching plants at the manufacturing stage. Meanwhile, ready-mixed concrete is allocated and delivered to construction sites by concrete mixer trucks at the transportation stage. A bi-level programming model for the integrated problem is established. The bi-level optimization problem is transformed into a single-level problem by KKT (Karush-Kuhn-Tucker) optimality conditions. In order to validate the proposed model, a case study is conducted based on real-world problems. Experimental results show that the proposed method efficiently solves the integrated problem and the model can not only reduce carbon emissions but also optimize transportation time.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] A bi-level programming model for green supplier selection and order allocation
    Sun, Xinyan
    Zhao, Qilan
    [J]. 2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [2] A Bi-level Programming Model to Solve Supplier Selection and Lot-Sizing Problem Addressing Quantity Discounts and Transportation Cost
    Zaheri, Fayegh
    Zandieh, Mostafa
    Taghavifard, Mohammad Taghi
    Najafi, Esmaeil
    [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2018, 17 (02): : 267 - 280
  • [3] The Bi-level Programming Model between the Manufacture and the Supplier
    Hu Chang-ying
    [J]. 2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 362 - 367
  • [4] A bi-level programming model for supplier selection in constructing logistics service supply chain
    Guo, Mei
    Zhu, JinFu
    Zhao, XiuLi
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1614 - 1618
  • [5] Continuous Transportation Network Design Problem Based on Bi-level Programming Model
    Sun, Zhichen
    [J]. GREEN INTELLIGENT TRANSPORTATION SYSTEM AND SAFETY, 2016, 138 : 277 - 282
  • [6] Bi-level programming for supplier selection under quantity discount policy
    Zaheri, F.
    Zandieh, M.
    Taghavifard, M. T.
    [J]. SCIENTIA IRANICA, 2017, 24 (04) : 2095 - 2104
  • [7] Bi-level programming model and algorithm of container transportation network
    Zhu, XN
    [J]. PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 457 - 461
  • [8] A Bi-level Programming to Two-stage Transportation Planning Problem
    Feng, Cuiying
    Nie, Ling
    [J]. 2014 SEVENTH INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION (CSO), 2014, : 616 - 620
  • [9] A Novel SVR Parameter Selection Base on Bi-level Programming Problem
    Feng Xiangdong
    Hu Guanghua
    [J]. CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 6025 - 6029
  • [10] A bi-level programming model for the optimal lane reservation problem
    Cheng, Qixiu
    Chen, Yinghao
    Liu, Zhiyuan
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2022, 189