A qualitative analysis of Lean implementation in Brazilian surgical centres: a multiple-case study

被引:2
|
作者
de Sousa, Paulo Renato [1 ]
Barbosa, Marcelo Werneck [2 ]
Tontini, Gerson [3 ]
Rosado Filho, Aloisio [4 ]
Macedo Pires Ferreira, Maria Madalena [4 ]
机构
[1] Fundacao Dom Cabral, Alphaville Lagoa Ingleses, Ave Princesa Diana 760, BR-018006 Nova Lima, Brazil
[2] Univ Autonoma Chile, Fac Adm & Negocios, Pedro de Valdivia 425, Santiago, Chile
[3] FURB Reg Univ Blumenau, R Antonio da Veiga 140, BR-89030903 Blumenau, SC, Brazil
[4] Hosp Sao Domingos, Av Jeronimo de Albuquerque 540, BR-65060645 Sao Luis, Maranhao, Brazil
关键词
Lean; surgical centre; operating rooms; Lean healthcare; Brazilian health system; process improvement; continuous improvement; quality of care; waste elimination; Lean culture; OPERATING-ROOM EFFICIENCY; 6 SIGMA METHODOLOGY; HEALTH-CARE; SURGERY; REDUCE; MODEL; WORK;
D O I
10.1504/IJHTM.2021.119164
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
Different studies have been published in recent years describing the experiences of adopting Lean thinking in healthcare institutions. However, the analysis of Lean implementations in hospitals located in emerging economies is lacking. Besides, Lean implementations are usually reported based on a single case study. This study analyses Lean adoption in four Brazilian surgical centres, using a multiple-case approach using semi- structured interviews. Results suggest that Lean implementation reduces the duration of operations and the time the patient stays in the hospital, improves the punctuality of procedures, reduces losses, errors, materials' usage, preparation time, and increases collaborators' satisfaction. Primary challenges to implementing Lean include changes to organisational culture and involvement of multidisciplinary teams. By using a multiple-case design, it is possible to compare different outcomes and more confidently generalise these results to other surgical centres. We expect this study stimulates the implementation and analysis of Lean adoption in other emerging economies.
引用
下载
收藏
页码:168 / 185
页数:18
相关论文
共 50 条
  • [41] Domestic energy consumption patterns in a hot and humid climate: A multiple-case study analysis
    Aldossary, Naief A.
    Rezgui, Yacine
    Kwan, Alan
    APPLIED ENERGY, 2014, 114 : 353 - 365
  • [42] The implementation of lean construction tools: Findings from a qualitative study
    Marhani M.A.
    Bari N.A.A.
    Ahmad K.
    Jaapar A.
    Marhani, Mohd Arif (arif2713@salam.uitm.edu.my), 2018, Italian Association of Chemical Engineering - AIDIC (63): : 295 - 300
  • [43] Determinants and barriers to lean implementation in food-processing SMEs - a multiple case analysis
    Dora, Manoj
    Kumar, Maneesh
    Gellynck, Xavier
    PRODUCTION PLANNING & CONTROL, 2016, 27 (01) : 1 - 23
  • [45] How Enterprises Adopt Agile Structures: A Multiple-Case Study
    Gerster, Daniel
    Dremel, Christian
    Brenner, Walter
    Kelker, Prashant
    PROCEEDINGS OF THE 52ND ANNUAL HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES, 2019, : 4957 - 4966
  • [46] A multiple-case study on students' sourcing activities in a group task
    Brante, Eva Wennas
    COGENT EDUCATION, 2019, 6 (01):
  • [47] Industry Application of Continuous Integration Modeling: A Multiple-Case Study
    Stahl, Daniel
    Bosch, Jan
    2016 IEEE/ACM 38TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING COMPANION (ICSE-C), 2016, : 270 - 279
  • [48] Social Enterprises and Public Value: A Multiple-Case Study Assessment
    Federica Bandini
    Sabrina Gigli
    Laura Mariani
    VOLUNTAS: International Journal of Voluntary and Nonprofit Organizations, 2021, 32 : 61 - 77
  • [49] Automated Software Integration Flows in Industry: A Multiple-Case Study
    Stahl, Daniel
    Bosch, Jan
    36TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING (ICSE COMPANION 2014), 2014, : 54 - 63
  • [50] Collaborative procurement strategies for infrastructure projects: a multiple-case study
    Eriksson, Per Erik
    Volker, Leentje
    Kadefors, Anna
    Lingegard, Sofia
    Larsson, Johan
    Rosander, Lilly
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2019, 172 (05) : 197 - 205