Multiobjective Modeling and Optimization for Scheduling a Stochastic Hybrid Flow Shop With Maximizing Processing Quality and Minimizing Total Tardiness

被引:41
|
作者
Fu, Yaping [1 ,2 ]
Wang, Hongfeng [2 ]
Wang, Junwei [3 ]
Pu, Xujin [4 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Northeastern Univ, Coll Informat Sci & Engn, Shenyang 110819, Peoples R China
[3] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Peoples R China
[4] Jiangnan Univ, Dept Management Sci & Engn, Wuxi 214122, Jiangsu, Peoples R China
来源
IEEE SYSTEMS JOURNAL | 2021年 / 15卷 / 03期
基金
中国国家自然科学基金;
关键词
Job shop scheduling; Stochastic processes; Manufacturing systems; Uncertainty; Mathematical model; Artificial bee colony algorithm; hybrid flow shop; multiobjective scheduling; processing quality; stochastic scheduling; stochastic simulation; MANUFACTURING SYSTEMS; ALGORITHM; TIME; MANAGEMENT; 2-STAGE; DESIGN;
D O I
10.1109/JSYST.2020.3014093
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Currently, manufacturing enterprises attach great importance to improving processing quality and customer satisfaction. Hybrid flow shops have widespread applications in real-world manufacturing systems such as steel production and chemical industry. In a practical production process, uncertainty commonly arises due to the difficulty of knowing exact information of facilities and jobs beforehand. In order to improve processing quality and customer satisfaction of manufacturing systems in uncertain environments, this article proposes a stochastic multiobjective hybrid flow shop scheduling problem aiming at maximizing processing quality and minimizing total tardiness, where the processing time of jobs obeys a known random distribution. To describe jobs' processing quality mathematically, a quality-based cost function is presented, and further a chance-constrained programming approach is used to formulate this problem. Then, a multiobjective artificial bee colony algorithm incorporating a stochastic simulation approach is designed by considering its characteristics. Simulation experiments are performed on a set of instances and several state-of-the-art multiobjective optimization algorithms are chosen as peer approaches. Experiment results confirm that the proposed algorithm has an excellent performance in handling this problem.
引用
收藏
页码:4696 / 4707
页数:12
相关论文
共 50 条
  • [41] Multiobjective Scheduling of Energy-Efficient Stochastic Hybrid Open Shop With Brain Storm Optimization and Simulation Evaluation
    Fu, Yaping
    Zhou, Mengchu
    Guo, Xiwang
    Qi, Liang
    Gao, Kaizhou
    Albeshri, Aiiad
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2024, 54 (07): : 4260 - 4272
  • [42] Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates
    Mor, Baruch
    Mosheiov, Gur
    Shabtay, Dvir
    JOURNAL OF SCHEDULING, 2021, 24 (06) : 553 - 567
  • [43] Parallel processor scheduling for minimizing total weighted tardiness using ant colony optimization
    Raghavan, N. R. Srinivasa
    Venkataramana, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (9-10): : 986 - 996
  • [44] A new efficient heuristic method for minimizing the total tardiness in a no-idle permutation flow shop
    Nagano M.S.
    Rossi F.L.
    Tomazella C.P.
    Production Engineering, 2017, 11 (4-5) : 523 - 529
  • [45] Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming
    Ronconi, Debora P.
    Powell, Warren B.
    JOURNAL OF SCHEDULING, 2010, 13 (06) : 597 - 607
  • [46] Minimizing non-processing energy consumption/total weighted tardiness & earliness, and makespan into typical production scheduling model-the job shop scheduling problem
    Jyothi, Kilari
    Dubey, R. B.
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 45 (04) : 6959 - 6981
  • [47] Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming
    Débora P. Ronconi
    Warren B. Powell
    Journal of Scheduling, 2010, 13 : 597 - 607
  • [48] A hybrid particle swarm optimization for parallel machine total tardiness scheduling
    Niu, Qun
    Zhou, Taijin
    Wang, Ling
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 723 - 739
  • [49] Fuzzy Rough Total Weighted Tardiness Flow Shop Scheduling Model with Hurwicz Criterion
    Touil, Achraf
    Echchatbi, Abdelwahed
    2020 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2020,
  • [50] Two-machine flow shop total tardiness scheduling problem with deteriorating jobs
    Bank, M.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Behnamian, J.
    APPLIED MATHEMATICAL MODELLING, 2012, 36 (11) : 5418 - 5426