IMPROVED EIGHT-PROCESS MODEL OF PRECAST COMPONENT PRODUCTION SCHEDULING CONSIDERING RESOURCE CONSTRAINTS

被引:8
|
作者
Ruan, Minhao [1 ]
Xu, Feng [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, Shanghai Key Lab Digital Maintenance Bldg & Infra, Shanghai, Peoples R China
关键词
production scheduling; precast concrete components; production resource constraints; enterprise decision-making; transportation scheme; genetic algorithm; MULTIPLE PRODUCTION; DEMAND VARIABILITY; CONSTRUCTION; FABRICATION; LINES;
D O I
10.3846/jcem.2022.16454
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Reasonable production scheduling plays a vital role in the production of precast component factories. However, previous static scheduling models no longer fit actual production. In particular, some factors will cause errors in the actual delivery time of the components, including the lack or redundancy of processes in the model, resource constraints required by the core processes, and differences in transportation schemes. Moreover, the optimization goal of simply pursuing the minimization of fines from order delivery underestimates companies' emphases on reputation. Therefore, this study proposes an improved model for precast component production scheduling considering resource constraints. The number of production processes is adjusted to eight, and three resource constraints for mold, steel, and concrete are added. An enterprise decision-making coefficient is introduced into the optimization object function, and the constraints of the transportation scheme are improved. Finally, a real case study is conducted to verify the applicability of the model. Compared with previous models, the developed model fills the gap in considering production resource constraints and enterprise decisions in precast production, can better meet diverse production conditions and business needs of factories for scheduling, and help give full play to the advantages of prefabricated construction.
引用
收藏
页码:208 / 222
页数:15
相关论文
共 50 条
  • [31] Preemptive maintenance process scheduling under complex human resource constraints
    Sun X.
    Song W.-X.
    Ban L.-M.
    Qi X.-G.
    [J]. Kongzhi yu Juece/Control and Decision, 2022, 37 (02): : 393 - 400
  • [32] Considering human resource constraints for real joint production and maintenance schedules
    Bouzidi-Hassini, S.
    Tayeb, F. Benbouzid-Si
    Marmier, F.
    Rabahi, M.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 90 : 197 - 211
  • [33] Project scheduling optimization of random graph MDP considering active/passive resource constraints
    Li, Aiqin
    Wang, Ningfei
    Yu, Jiecheng
    Deng, Cong
    [J]. MEASUREMENT, 2019, 144 : 7 - 13
  • [34] Supply-Demand Interactive Scheduling Model Considering Short Production Process of Steel Enterprises
    Wang H.
    Zhang L.
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2021, 45 (15): : 64 - 76
  • [35] Product Scheduling Optimization under Resource Constraints Based on Improved Genetic Algorithm
    Liu, Hang
    Jia, Wen
    Zhang, Ruijia
    [J]. ACM International Conference Proceeding Series, : 392 - 400
  • [36] An Improved Hierarchical Genetic Algorithm for Sheet Cutting Scheduling with Process Constraints
    Rao, Yunqing
    Qi, Dezhong
    Li, Jinling
    [J]. SCIENTIFIC WORLD JOURNAL, 2013,
  • [37] Batch Scheduling Problem of Oil Well Considering Ramping Constraints in Oilfield Production
    Lang J.
    Tang L.-X.
    [J]. Zidonghua Xuebao/Acta Automatica Sinica, 2019, 45 (02): : 388 - 397
  • [38] Scheduling optimization of refinery and chemical production process considering the safety and stability of scheduling operation
    Gao X.
    Huang F.
    Zheng W.
    Peng D.
    Yang Y.
    Huang D.
    [J]. Huagong Xuebao/CIESC Journal, 2023, 74 (04): : 1619 - 1629
  • [39] Chemical production process portfolio optimization considering resource integration
    Shehab, Shaza
    Linke, Patrick
    Al-Mohannadi, Dhabia M.
    [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2022, 179 : 285 - 297
  • [40] Chemical production process portfolio optimization considering resource integration
    Shehab, Shaza
    Linke, Patrick
    Al-Mohannadi, Dhabia M.
    [J]. Chemical Engineering Research and Design, 2022, 179 : 285 - 297