Modeling Profitability-Influencing Risk Factors for Construction Projects: A System Dynamics Approach

被引:19
|
作者
Jahan, Shah [1 ]
Khan, Khurram Iqbal Ahmad [1 ]
Thaheem, Muhammad Jamaluddin [2 ]
Ullah, Fahim [3 ]
Alqurashi, Muwaffaq [4 ]
Alsulami, Badr T. [5 ]
机构
[1] Natl Univ Sci & Technol NUST, Dept Construct Engn & Management, Islamabad 44000, Pakistan
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong Waterfront Campus, Geelong, Vic 3220, Australia
[3] Univ Southern Queensland, Sch Surveying & Built Environm, Springfield, Qld 4300, Australia
[4] Taif Univ, Coll Engn, Dept Civil Engn, POB 11099, Taif 21944, Saudi Arabia
[5] Umm Al Qura Univ, Coll Engn & Islamic Architecture, Dept Civil Engn, Mecca 24382, Saudi Arabia
关键词
causal loop diagram; profitability-influencing risk factors; profitability-influencing risk categories; system dynamics; systems thinking; FUZZY-LOGIC; MANAGEMENT; UNCERTAINTY; COMPLEXITY; PROFIT;
D O I
10.3390/buildings12060701
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study addressed the complexity involved in integrating the causative risk factors influencing construction profitability. Most of the existing studies cover the individual effects of profitability influencing factors. Very few focus on the systematic impact without incorporating the complexity and associated dynamics, presenting a gap targeted by the current study. The current study aimed to assess causative interrelations and interdependencies between profitability influencing risk factors (PIRF), through systems thinking (ST) and system dynamics (SD) modeling. The SD approach was used to evaluate the integrated impacts on profitability-influencing risk categories (PIRC) in construction projects. The causative influencing factors affecting construction profitability were identified through a comprehensive literature review. These were ranked using content analysis, and categorized into significant issues. Through 250 structured surveys and 15 expert opinion meetings, the path for quantitative and qualitative evaluations was prepared. Following these investigations, a causal loop diagram (CLD) was established using the ST technique, and the integrated effect was quantified using SD modeling. The study finds the rising cost of material, supply chain process, payment issues, planning and scheduling problems, financial difficulties, and effective control of manpower and equipment resources as the most critical PIRFs. The integrated effects of PIRFs on PIRC were quantified using SD modeling. This study helps field professionals with profitability-influencing factors, diagnosing issues, and integrating impacts regarding decision-making and policy formulation. For researchers, it presents a list of factors that can be investigated in detail, and the holistic interrelationships established.
引用
收藏
页数:22
相关论文
共 50 条
  • [31] Factors Influencing the Duration of Road Construction Projects in Sri Lanka
    Pathiranage, Yasas L.
    Halwatura, Rangika U.
    ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2010, 43 (04): : 17 - 30
  • [32] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Andrew Kavuma
    Jongho Ock
    Hyounseung Jang
    KSCE Journal of Civil Engineering, 2019, 23 : 1442 - 1450
  • [33] Integrating system dynamics and fuzzy bargaining for quantitative risk allocation in construction projects
    Nasirzadeh, F.
    Rouhparvar, M.
    Zadeh, H. Mazandarani
    Rezaie, M.
    SCIENTIA IRANICA, 2015, 22 (03) : 668 - 678
  • [34] Performance Prediction of Construction Projects Based on the Causes of Claims: A System Dynamics Approach
    Ansari, Ramin
    Khalilzadeh, Mohammad
    Taherkhani, Roohollah
    Antucheviciene, Jurgita
    Migilinskas, Darius
    Moradi, Shohreh
    SUSTAINABILITY, 2022, 14 (07)
  • [35] Analysis on Key Influencing Factors of Assembly Construction Development Based on System Dynamics
    Qu Bingru
    Li Weidong
    PROCEEDINGS OF THE FOURTH INTERNATIONAL SYMPOSIUM - MANAGEMENT, INNOVATION & DEVELOPMENT, BK ONE & TWO, 2017, : 91 - 96
  • [36] Risk factors influencing tunnel construction safety: Structural equation model approach
    Yang, Yanqun
    Wang, Yu
    Easa, Said M.
    Yan, Xiaobo
    HELIYON, 2023, 9 (01)
  • [37] A Combined Modeling Approach for Delay Management in Construction Projects Based on a Two-objective Mathematical Model and System Dynamics
    Goodarzi, H.
    Ehsanifar, M.
    Mirhosseini, S. M.
    Mazaheri, H.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2025, 38 (04): : 945 - 963
  • [38] Modeling success factors for public construction projects with the SEM approach: engineer's perspective
    Sinesilassie, Ephrem Girma
    Tripathi, Kamalendra Kumar
    Tabish, Syed Zafar Shahid
    Jha, Kumar Neeraj
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (10) : 2410 - 2431
  • [39] Risk Influence Analysis Assessing the Profitability of Large Photovoltaic Plant Construction Projects
    Serrano-Gomez, Luis
    Munoz-Hernandez, Jose Ignacio
    SUSTAINABILITY, 2020, 12 (21) : 1 - 16
  • [40] Deconstructing the Construction Industry: A Spatiotemporal Clustering Approach to Profitability Modeling
    Choi, Kunhee
    Lee, Hyun Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (10)