Optimal Replacement Schedule in a Deteriorating Production System With Deterministic, Random Lead Time for Replacement

被引:7
|
作者
Hsieh, Chung-Chi [1 ]
Liu, Yu-Te [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Ind & Informat Management, Tainan 70101, Taiwan
关键词
Deterioration; lead time; maintenance; replacement schedule; schedule point; AGE-REPLACEMENT; MAINTENANCE POLICIES; PRODUCTION-INVENTORY; RANDOM SHOCKS; FAILURE RATE; MODEL; SUBJECT; REPAIR; DELAY;
D O I
10.1109/TR.2010.2056410
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This study investigates the replacement schedule for a production system with a non-repairable key module that deteriorates over time, and is subject to random failure. We examine the case where replacing the key module requires lead time for preparing such replacement. Our aim is to determine the cost-minimizing schedule point that signals the point in time when the preparation of key module replacement shall start. We propose two models with deterministic lead time, and two models with random lead time in response to whether or not a prespecified quality level shall be met during a system operating cycle. The numerical results demonstrate that longer expected lead time advances the optimal schedule points, and increases the expected system costs per unit time in all models, while a higher variation of lead time advances the optimal schedule points, and increases the expected system costs per unit time in the models with random lead time. The numerical results also reveal that, relaxing the constraint of meeting a prespecified quality level, even in the presence of penalty, may be more economical than having this constraint. Our findings shed light on system maintenance with uncertainties in the activities required prior to component replacement.
引用
收藏
页码:517 / 527
页数:11
相关论文
共 50 条
  • [41] Optimal Production Run Length for Deteriorating Production System in Fuzzy Random Environments
    Ji, Ya-Ping
    Hu, Jin-Song
    Zhou, Yan
    Zhang, Guang-Ming
    Hu, Yue-Ying
    [J]. 2011 INTERNATIONAL CONFERENCE ON COMPUTERS, COMMUNICATIONS, CONTROL AND AUTOMATION (CCCA 2011), VOL I, 2010, : 241 - 245
  • [42] JOINTLY OPTIMAL DETERMINISTIC INVENTORY AND REPLACEMENT POLICIES
    FALKNER, CH
    [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (09): : 622 - 635
  • [43] On a Markovian deteriorating system with uncertain repair and replacement
    Tamura, N
    [J]. Advanced Reliability Modeling, 2004, : 523 - 530
  • [44] Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time
    Chien, Yu-Hung
    Sheu, Shey-Huei
    Chang, Chin-Chih
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2009, 40 (07) : 703 - 715
  • [45] Optimal replacement policy based on the effective age of the system for a deteriorating repairable system with multiple vacations
    Wu, Wenfeng
    Song, Jianshe
    Jiang, Kexia
    Li, Hao
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2021, 27 (04) : 671 - 679
  • [46] Production and replacement planning of a deteriorating remanufacturing system in a closed-loop configuration
    Ouaret, Samir
    Kenne, Jean-Pierre
    Gharbi, Ali
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2019, 53 : 234 - 248
  • [47] Optimal scheduling replacement policies for a system with multiple random works
    Chen, Yen-Luan
    [J]. COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2019, 48 (03) : 676 - 688
  • [48] Scheduling optimal replacement policies for a stochastically deteriorating system subject to two types of shocks
    Dong, Wenjie
    Liu, Sifeng
    Cao, Yingsai
    Javed, Saad Ahmed
    [J]. ISA TRANSACTIONS, 2021, 112 : 292 - 301
  • [49] Optimal order-replacement policy for a deteriorating system based on delayed geometric process
    Cheng, Guo-Qing
    Zhou, Bing-Hai
    Li, Ling
    [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (08): : 1101 - 1107
  • [50] OPTIMAL RANDOM AGE REPLACEMENT FOR AVAILABILITY
    Angus, John E.
    Yin, Meng-Lai
    Trivedi, Kishor
    [J]. INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2012, 19 (05):