Numerical Modeling of Gas Migration through Cement Sheath and Microannulus

被引:10
|
作者
Al Ramadan, Mustafa [2 ,3 ]
Salehi, Saeed [1 ]
Aljawad, Murtada S. [2 ,3 ]
Teodoriu, Catalin [1 ]
机构
[1] Univ Oklahoma, Mewbourne Sch Petr & Geol Engn, Norman, OK 73019 USA
[2] King Fand Univ Petr & Minerals, Coll Petr Engn & Geosci, Dhahran 31261, Saudi Arabia
[3] King Fand Univ Petr & Minerals, Ctr Integrat Petr Res, Dhahran 31261, Saudi Arabia
来源
ACS OMEGA | 2021年 / 6卷 / 50期
关键词
WELLBORE INTEGRITY; SHRINKAGE; PRESSURE; PREVENT;
D O I
10.1021/acsomega.1c05566
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Cement sheath is considered an important barrier throughout the life cycle of the well. The integrity of the cement sheath plays a vital role in maintaining the integrity of wells. Cement's ability to seal the annular space or a wellbore, also known as cement sealability, is an important characteristic of the cement to maintain the well integrity. It is believed that placing cement in the annular space or wellbore can totally prevent any leakage; however, that is debatable. The reason why cement cannot completely prevent fluid leakage is that cement is considered as a porous medium, and also flaws in cement, such as microannuli, channels, and fractures, can develop within the cement sheath. Furthermore, the complexity of casing/cement and cement/ formation interaction makes it very difficult to fully model the fluid migration. Hence, fluid can migrate between formations or to the surface. This article presents a numerical model for gas flow in cement sheath, including the microannulus flow. A parametric study of different variables and their effect on the leakage time is carried out, such as the microannulus gap size, cement matrix permeability, cement column length, and cement porosity. In addition, it presents leakage scenarios for different casing/liner overlap length with the existence of microannulus. The leakage scenarios revealed that the cement matrix permeability, microannulus gap size, and cement length can highly impact the leakage time; however, cement porosity has a minimal effect on the leakage time. In addition, modeling results revealed that the casing/liner overlap length should not be less than 300 ft, and the casing pressure duration should be beyond 30 min to detect any leak.
引用
收藏
页码:34931 / 34944
页数:14
相关论文
共 50 条
  • [21] Comparison of Numerical Methods That Predict Wellbore Cement Sheath Integrity
    Wise, Jarrett
    Nygaard, Runar
    ASME Open Journal of Engineering, 2023, 2
  • [22] Experimental and numerical investigations of accumulated plastic deformation in cement sheath during multistage fracturing in shale gas wells
    Xi, Yan
    Li, Jun
    Tao, Qian
    Guo, Boyun
    Liu, Gonghui
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2020, 187
  • [23] Numerical modeling of gas leakage through damaged composite laminates
    Kumazawa, Hisashi
    Whitcomb, John
    JOURNAL OF COMPOSITE MATERIALS, 2008, 42 (16) : 1619 - 1638
  • [24] Numerical Modeling of Natural Gas Transport Through Pipelines.
    Oroveanu, T.
    Trifan, C.
    Revue roumaine des sciences techniques. Serie de mecanique appliquee, 1985, 30 (04): : 371 - 384
  • [25] Effect of expandable cement on increasing sealing ability of cement sheath in shale gas wells
    Liu, Kui
    Gao, Deli
    Yang, Jin
    Wang, Zhengxu
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2019, 176 : 850 - 861
  • [26] Modeling of stress state of a perforated cement sheath in a production well
    Kireev, T. F.
    Bulgakova, G. T.
    8TH INTERNATIONAL CONFERENCE ON MATHEMATICAL MODELING IN PHYSICAL SCIENCE, 2019, 1391
  • [27] On persistent primary variables for numerical modeling of gas migration in a nuclear waste repository
    Alain Bourgeat
    Mladen Jurak
    Farid Smaï
    Computational Geosciences, 2013, 17 : 287 - 305
  • [28] On persistent primary variables for numerical modeling of gas migration in a nuclear waste repository
    Bourgeat, Alain
    Jurak, Mladen
    Smai, Farid
    COMPUTATIONAL GEOSCIENCES, 2013, 17 (02) : 287 - 305
  • [29] Experimental and Numerical Simulation on the Generation and Development of Cumulative Plastic Strain of Cement Sheath in Salt Cavern Gas Storage Well
    Ren, Zhenkun
    Xi, Yan
    Jiang, Hailong
    Li, Qian
    Li, Qing
    ENERGY SCIENCE & ENGINEERING, 2024, 12 (12) : 5443 - 5465
  • [30] Stress concentration of perforated cement sheath and the effect of cement sheath elastic parameters on its integrity failure during shale gas fracturing
    Bu, Yuhuan
    Yang, Heng
    Zhao, Lingyun
    Guo, Shenglai
    Liu, Huajie
    Ma, Xiaolong
    FRONTIERS IN MATERIALS, 2022, 9