Experimental Investigation on Air-Water Interaction in a Hydropower Station Combining a Diversion Tunnel with a Tailrace Tunnel

被引:11
|
作者
Zhang, Wen [1 ]
Cai, Fulin [1 ]
Zhou, Jianxu [1 ]
Hua, Yulong [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China
关键词
air-water interaction; hydropower station; tailrace tunnel combined with diversion tunnel; transient flow; pressure oscillation patterns; TRANSIENT CONDITIONS; FREE-SURFACE; DROP-SHAFT; FLOW; SIMULATION; GRAVITY; MODEL;
D O I
10.3390/w9040274
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Diversion tunnels are often used as tailrace tunnels in underground hydropower stations. The special layout results in complex flow regimes, including air-water two-phase flow. A set of experiments is conducted based on the model of a hydropower station which combines partial diversion tunnels with tailrace tunnels to investigate the interactions between the air and water phases in the combined diversion tunnels. Interactions between the air and water phases observed in the combined diversion tunnel significantly alter flow dynamics, and are classified into four types according to the initial tail water level. There is a range of initial tail water levels in which the interaction between the air and water phases cannot be neglected, and the range becomes greater when the change in flow rate increases. Such interactions may cause a pressure surge and the pressure surge reaches the maximum when the initial tail water level is approximately equal to the crown of the tunnel. The surge pressures do harm to the safety and stability of hydropower stations, so the condition should be considered and controlled.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Author Correction: Hydropower Station diversion tunnel layered excavation deformation mechanism under high crustal stress
    Hongke Zhou
    Hao Li
    Anrun Li
    Cong Xie
    Shuyu Wu
    Scientific Reports, 15 (1)
  • [32] Rockburst Prediction From the Perspective of Energy Release: A Case Study of a Diversion Tunnel at Jinping II Hydropower Station
    Fan, Yong
    Cui, Xianze
    Leng, Zhendong
    Zheng, Junwei
    Wang, Feng
    Xu, Xiaole
    FRONTIERS IN EARTH SCIENCE, 2021, 9
  • [34] Numerical Investigation on Air-Water Two-Phase Flow of Jinping-I Spillway Tunnel
    Wang, Xiaoqun
    Lian, Jijian
    APPLIED SCIENCES-BASEL, 2022, 12 (09):
  • [35] Three-dimensional nonlinear finite element simulation of excavation of the diversion tunnel No. 1 for Nuozhadu Hydropower Station
    Zhou Jia-wen
    Xu Wei-ya
    Tong Fu-guo
    Chu Wei-jiang
    Zhang Zong-liang
    Liu Xing-ning
    ROCK AND SOIL MECHANICS, 2008, 29 (12) : 3393 - 3400
  • [36] Experimental investigation of corotating vortex filaments in a water tunnel
    Rokhsaz, K
    Kliment, LK
    JOURNAL OF AIRCRAFT, 2003, 40 (06): : 1115 - 1122
  • [37] Stability Analysis of Surrounding Rock in the Diversion Tunnel at the Xulong Hydropower Station based on RFPA3D and Microseismic Monitoring
    Qian, Hongjian
    Tan, Zhou
    Li, Biao
    APPLIED SCIENCES-BASEL, 2022, 12 (19):
  • [38] Characteristics of Air-Water Bubbly flow in the Urban Deep-Tunnel Drainage System
    Wang, Zhigang
    Zhang, Dong
    Zhang, Hongwei
    Ren, Weichen
    PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, : 7066 - 7071
  • [39] Model test of the tunnel subjected to high water pressure in Jinping Second Cascade Hydropower Station, China
    JianXiu Wang
    Bo Feng
    LiSheng Hu
    PuZhuo Tian
    DongChang Sui
    YiQun Tang
    Ping Yang
    Science China Technological Sciences, 2011, 54 : 192 - 198
  • [40] Model test of the tunnel subjected to high water pressure in Jinping Second Cascade Hydropower Station,China
    WANG JianXiu 1
    2 Department of Geotechnical Engineering
    Science China Technological Sciences, 2011, (S1) : 192 - 198