Experimental Investigation on Air-Water Interaction in a Hydropower Station Combining a Diversion Tunnel with a Tailrace Tunnel

被引:11
|
作者
Zhang, Wen [1 ]
Cai, Fulin [1 ]
Zhou, Jianxu [1 ]
Hua, Yulong [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China
关键词
air-water interaction; hydropower station; tailrace tunnel combined with diversion tunnel; transient flow; pressure oscillation patterns; TRANSIENT CONDITIONS; FREE-SURFACE; DROP-SHAFT; FLOW; SIMULATION; GRAVITY; MODEL;
D O I
10.3390/w9040274
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Diversion tunnels are often used as tailrace tunnels in underground hydropower stations. The special layout results in complex flow regimes, including air-water two-phase flow. A set of experiments is conducted based on the model of a hydropower station which combines partial diversion tunnels with tailrace tunnels to investigate the interactions between the air and water phases in the combined diversion tunnels. Interactions between the air and water phases observed in the combined diversion tunnel significantly alter flow dynamics, and are classified into four types according to the initial tail water level. There is a range of initial tail water levels in which the interaction between the air and water phases cannot be neglected, and the range becomes greater when the change in flow rate increases. Such interactions may cause a pressure surge and the pressure surge reaches the maximum when the initial tail water level is approximately equal to the crown of the tunnel. The surge pressures do harm to the safety and stability of hydropower stations, so the condition should be considered and controlled.
引用
收藏
页数:14
相关论文
共 50 条
  • [2] Study on the disruption of water flow in the system of tailrace tunnel combined with diversion tunnel
    Li Ling
    Yang Jiandong
    Liu Meiqing
    27TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR 2014), PTS 1-7, 2014, 22
  • [3] Characteristics of heat and moisture transfer of tailrace tunnel ventilation in hydropower station
    Yu, Yan-Shun
    Li, Xian-Ting
    Shi, Wen-Xing
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2009, 33 (05): : 600 - 606
  • [4] Study on observation system of seismic forward prospecting in tunnel: A case on tailrace tunnel of Wudongde hydropower station
    Yang, Senlin
    Cao, Hongyi
    Zhang, Yi
    Chen, Lei
    Xu, Xinji
    Song, Jie
    Xu, Lei
    OPEN GEOSCIENCES, 2022, 14 (01): : 1 - 12
  • [5] Application of damping type surge tank with air hole in hydropower station having long tailrace tunnel
    Zheng, D.Q.
    Wang, N.S.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2001, (03):
  • [6] A simplified model of heat and moisture transfer for tailrace tunnel ventilating in hydropower station
    Yu, Yanshun
    Li, Xianting
    Shi, Wenxing
    APPLIED THERMAL ENGINEERING, 2009, 29 (14-15) : 3254 - 3260
  • [7] Development and Validation of Mathematical Model for Tailrace Tunnel Ventilating Process in Hydropower Station
    Yu, Yanshun
    Qian, Puhua
    Zhang, Shaofan
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4069 - 4073
  • [8] Prediction model of heat and moisture transfer of tailrace tunnel ventilation in hydropower station
    Yu, Yan-Shun
    Li, Xian-Ting
    Shi, Wen-Xing
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2008, 32 (01): : 73 - 77
  • [9] Monitoring analysis of diversion tunnel slope in HuangJinping hydropower station
    Li, Linrui
    Deng, Jianhui
    Zheng, Hongchun
    Chen, Tao
    Zhang, Zhenghu
    Liu, Tiexin
    Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition), 2014, 46 (SUPPL.1): : 116 - 121
  • [10] Stability Analysis of Slope and Diversion Water Tunnel of Hydropower Station under Strong Earthquake
    Wang, Zhongchang
    Li, Bo
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (03) : 2041 - 2049