New metrics and scheduling rules for disassembly and bulk recycling

被引:17
|
作者
Stuart, JA [1 ]
Christina, V
机构
[1] Purdue Univ, W Lafayette, IN 47907 USA
[2] Ohio State Univ, Columbus, OH 43210 USA
关键词
discrete-event simulation; electronics; -ecycling; end-of-life product returns; scheduling; shipment fill time;
D O I
10.1109/TEPM.2003.817723
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In recent years, growing quantities of end-of-life electronics have increased the amount of attention devoted to product recovery. Research on end-of-life electronics returns has primarily focused on manual disassembly operations. In this paper, we focus on the scheduling problem for a facility with staging, manual disassembly operations, and bulk recycling. In bulk recycling, shredding or grinding reduces the size of the material fragments while magnetic, eddy current or other density separation techniques separate the material fragments. Unlike production, there are often no due dates in materials recovery processing. Recyclers can sell the recovered materials to material commodity buyers at any time. However, recyclers wait to accumulate a shipment of material to reduce transportation costs and meet minimum sales quantities. Another important difference between production and recycling is that manufacturers purchase raw materials while recyclers may be paid to receive products. When due dates do not apply to scheduling products for materials recycling and product receipts generate revenue for recycling services, we propose two new metrics: the staging space turnover and the shipment fill time. We use our metrics to analyze new scheduling rules for disassembly and bulk recycling and to evaluate their performance. Using discrete-event simulation models, we test our scheduling rules on seven product families, where product families are defined based on material composition and separation operations. Of the rules we test, the disassembly scheduling rule which ranks product families based on the ratio of product size to disassembly time (SDT) most quickly empties the staging space. Shipment fill time is less sensitive to our scheduling rules. Our results illustrate how a recycler can reduce incoming product inventory with a new scheduling rule.
引用
收藏
页码:133 / 140
页数:8
相关论文
共 50 条
  • [1] Product design for disassembly and bulk recycling
    Sodhi, M
    Knight, WA
    [J]. CIRP ANNALS 1998 - MANUFACTURING TECHNOLOGY, VOL 47, NO 1, 1998, 47 : 115 - 118
  • [2] Integrated planning of electronic scrap disassembly and bulk recycling
    Ploog, M
    Spengler, T
    [J]. 2002 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2002, : 263 - 268
  • [3] Scheduling selective disassembly for plastics recovery in an electronics recycling center
    Rios, PJ
    Stuart, JA
    [J]. IEEE TRANSACTIONS ON ELECTRONICS PACKAGING MANUFACTURING, 2004, 27 (03): : 187 - 197
  • [4] Disassembly and recycling
    Rupprecht, R
    [J]. INDUSTRIAL ROBOT, 1996, 23 (03): : 4 - 4
  • [5] Disassembly AND/OR graph model for "disassembly for recycling"
    Gao, JG
    Xiang, D
    Chen, HF
    Duan, GH
    Wang, JS
    [J]. 2003 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2003, : 54 - 59
  • [6] SCHEDULING DISASSEMBLY
    GUPTA, SM
    TALEB, KN
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) : 1857 - 1866
  • [7] Robots in recycling and disassembly
    Bogue, Robert
    [J]. INDUSTRIAL ROBOT-THE INTERNATIONAL JOURNAL OF ROBOTICS RESEARCH AND APPLICATION, 2019, 46 (04): : 461 - 466
  • [8] Integrated planning of acquisition, disassembly and bulk recycling:: a case study on electronic scrap recovery
    Spengler, T
    Ploog, M
    Schröter, M
    [J]. OR SPECTRUM, 2003, 25 (03) : 413 - 442
  • [9] Integrated planning of acquisition, disassembly and bulk recycling: a case study on electronic scrap recovery
    Thomas Spengler
    Martin Ploog
    Marcus Schröter
    [J]. OR Spectrum, 2003, 25 (3) : 413 - 442
  • [10] A disassembly model for PC recycling
    Zhang, HC
    [J]. ADVANCED DESIGN AND MANUFACTURE IN THE GLOBAL MANUFACTURING ERA, VOL 1, 1997, : 113 - 118