Maximizing the weighted number of just-in-time jobs in flow shop scheduling

被引:26
|
作者
Choi, Byung-Cheon
Yoon, Suk-Hun
机构
[1] Soongsil Univ, Dept Ind & Informat Syst Engn, Seoul 156743, South Korea
[2] Seoul Natl Univ, Dept Ind Engn, Seoul, South Korea
关键词
scheduling; just-in-time jobs; NP-complete;
D O I
10.1007/s10951-007-0030-z
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we consider the maximization of the weighted number of just-in-time jobs that should be completed exactly on their due dates in n-job, m-machine flow shop problems. We show that a two-machine flow shop problem is NP-complete. When job weights are all identical, we show that the problem can be solved in polynomial time. We also show that a three-machine flow shop problem with identical job weights is NP-hard in the strong sense by reduction of the 3-partition problem.
引用
收藏
页码:237 / 243
页数:7
相关论文
共 50 条
  • [31] Research of Just-in-time Scheduling for Assembly Job Shop
    Lü H.
    Zhu J.
    Wang Z.
    Wu S.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2021, 57 (05): : 157 - 165
  • [32] Lagrangian bounds for just-in-time job-shop scheduling
    Baptiste, Philippe
    Flamini, Marta
    Sourd, Francis
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) : 906 - 915
  • [33] Concurrent open shop scheduling to minimize the weighted number of tardy jobs
    Ng, CT
    Cheng, TCE
    Yuan, JJ
    JOURNAL OF SCHEDULING, 2003, 6 (04) : 405 - 412
  • [34] Concurrent Open Shop Scheduling to Minimize the Weighted Number of Tardy Jobs
    C. T. Ng
    T. C. E. Cheng
    J. J. Yuan
    Journal of Scheduling, 2003, 6 : 405 - 412
  • [36] Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs
    Chen, Ren-Xia
    Li, Shi-Sheng
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2021, 38 (02)
  • [37] A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs
    Thangaraja, M.
    Kumar, T. Jayanth
    Nandan, K. R.
    JOURNAL OF PROJECT MANAGEMENT, 2022,
  • [38] A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs
    Thangaraj, M.
    Kumar, T. Jayanth
    Nandan, K. R.
    JOURNAL OF PROJECT MANAGEMENT, 2022, 7 (04) : 229 - 240
  • [39] OPTIMIZATION OF JUST-IN-TIME PART SUPPLY SCHEDULING IN ASSEMBLY JOB SHOP
    Sun, Lin
    Xiao, Feng
    2019 16TH INTERNATIONAL COMPUTER CONFERENCE ON WAVELET ACTIVE MEDIA TECHNOLOGY AND INFORMATION PROCESSING (ICWAMTIP), 2019, : 443 - 446
  • [40] A NETWORK FLOW ALGORITHM FOR JUST-IN-TIME PROJECT SCHEDULING
    LEVNER, EV
    NEMIROVSKY, AS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 79 (02) : 167 - 175