Stability Evaluation on Surrounding Rocks of Underground Powerhouse Based on Microseismic Monitoring

被引:11
|
作者
Dai, Feng [1 ]
Li, Biao [1 ]
Xu, Nuwen [1 ]
Zhu, Yongguo [2 ]
Xiao, Peiwei [2 ]
机构
[1] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Peoples R China
[2] China Guodian Dadu River Houziyan Hydropower Dev, Kangding 626005, Peoples R China
基金
中国国家自然科学基金;
关键词
HYDROPOWER STATION; EXCAVATION; MASS; DISPLACEMENT; CONTINUUM;
D O I
10.1155/2015/937181
中图分类号
O42 [声学];
学科分类号
070206 ; 082403 ;
摘要
To study the stability of underground powerhouse at Houziyan hydropower station during excavation, a microseismic monitoring system is adopted. Based on the space-time distribution characteristics of microseismic events during excavation of the main powerhouse, the correlation between microseismic events and blasting construction is established; and the microseismic clustering areas of the underground powerhouse are identified and delineated. The FLAC3D code is used to simulate the deformation of main powerhouse. The simulated deformation characteristics are consistent with that recorded by microseismic monitoring. Finally, the correlation between the macroscopic deformation of surrounding rock mass and microseismic activities is also revealed. The results show that multiple faults between 1# and 3# bus tunnels are activated during excavation of floors V and VI of the main powerhouse. The comprehensive method combining microseismic monitoring with numerical simulation as well as routine monitoring can provide an effective way to evaluate the surrounding rock mass stability of underground caverns.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] Application of Microseismic Monitoring in Analysing the Stability of Underground Cavern
    Vikalp Kumar
    Prakash Chandra Jha
    Nagendra Pratap Singh
    Sivakumar Cherukuri
    Journal of the Geological Society of India, 2021, 97 : 1379 - 1386
  • [22] Stability study on the surrounding rock of the underground powerhouse in Shui Buya project by DDA
    Ding, XL
    Fu, J
    Dong, ZH
    Wu, AQ
    DEVELOPMENT AND APPLICATION OF DISCONTINUOUS MODELLING FOR ROCK ENGINEERING, 2003, : 75 - 78
  • [23] Rockburst prediction and stability analysis of the access tunnel in the main powerhouse of a hydropower station based on microseismic monitoring
    Xue, Ruixiong
    Liang, Zhengzhao
    Xu, Nuwen
    Dong, Linlu
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2020, 126
  • [24] Stability Analysis and Fracture Mechanism of Surrounding Rock in a Hydraulic Tunnel Based on Microseismic Monitoring
    Li, Zhi
    Mao, Haoyu
    Li, Biao
    Zhou, Xiang
    Liao, Guo
    Chen, Jianjun
    APPLIED SCIENCES-BASEL, 2022, 12 (18):
  • [25] Stability evaluation of excavated rockmass in mines based on microseismic monitoring
    Zheng, C. (zhengchao020611@163.com), 2012, China Coal Society (37):
  • [26] Stability Analysis of Surrounding Rock in Mining Tunnels Based on Microseismic Monitoring and Numerical Simulation
    Wu, Hao
    Li, Qingfeng
    Zhu, Chuanqu
    Tang, Pei
    SUSTAINABILITY, 2025, 17 (02)
  • [27] Long-term time-dependent deformation and stability analysis of the machine hall of an underground powerhouse cavern using microseismic monitoring
    Kumar, Vikalp
    Balasubramaniam, V. R.
    NEAR SURFACE GEOPHYSICS, 2025, 23 (01) : 69 - 86
  • [28] Deformation evaluation on surrounding rocks of underground caverns based on PSO-LSSVM
    Xue, Xinhua
    Xiao, Ming
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 69 : 171 - 181
  • [29] BACK ANALYSIS AND STABILITY PREDICTION OF SURROUNDING ROCK DURING EXCAVATION OF THE SHUANGJIANGKOU UNDERGROUND POWERHOUSE
    Li, You
    Xiao, Ming -Li
    Feng, Gan
    Cai, Ming-Guang
    Wu, Jia-Ming
    Pei, Jian-Liang
    He, Jiang -Da
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2024, 30 (03) : 264 - 278
  • [30] Block Stability Analysis on Surrounding Rock Mass of Underground Powerhouse and anchor Support Design
    Wang, Zhong-Chang
    Zhao, De-Shen
    Yang, Qing
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 83 - 87