共 50 条
- [21] An integrated vendor–buyer cooperative model under stochastic supply lead-time [J]. The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1043 - 1050
- [26] An integrated vendor-buyer cooperative model under stochastic supply lead-time [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (9-10): : 1043 - 1050
- [27] Integrated Inventory Model with Lot Size, Production Rate and Lead Time Interactions [J]. ICOSCM 2009 - PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT, 2009, 3 : 149 - 156