Key techniques for the largest curved pipe jacking roof to date: A case study of Gongbei tunnel

被引:67
|
作者
Zhang, Peng [1 ]
Ma, Baosong [1 ]
Zeng, Cong [1 ]
Xie, Hongming [1 ]
Li, Xuan [1 ]
Wang, Daowei [1 ]
机构
[1] China Univ Geosci, Fac Engn, Wuhan 430074, Peoples R China
关键词
Pipe jacking roof; Curved pipe jacking; Trajectory deviation; Joint seal; Reception device; CONSTRUCTION;
D O I
10.1016/j.tust.2016.07.001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Gongbei tunnel, as a part of the Zhuhai Connection highway and Hongkong-Zhuhai-Macao Bridge project, is currently being constructed in Zhuhai, China. To guarantee the tunnel traversing under the Gongbei Port, a combination technology of curved pipe jacking roof for ground support and ground freezing for waterproof is applied. This jacked pipe roof, comprised 36 steel pipe strings of 1620 mm diameter with 355-358 mm gap between adjacent strings, has been faced with various challenges for design and construction due to the site conditions of multiple soft soil and high underground water pressure. These challenges include risks of excessive soil deformation, possibility of path deviation, excessive jacking force, leaking of pipe joint and failure of jacking machine gasketed launch and reception devices. This paper provides an overview of this project, summarizes the most challenging aspects they faced and introduces the relevant techniques applied during construction. (C) 2016 Published by Elsevier Ltd.
引用
收藏
页码:134 / 145
页数:12
相关论文
共 50 条
  • [41] Study of Mechanical Model for Pipe Roof in Talus Tunnel Considering Spatial Effect
    Ding Z.
    Fu J.
    Liu X.
    Huang J.
    Tiedao Xuebao/Journal of the China Railway Society, 2018, 40 (07): : 121 - 127
  • [42] Soil Layer Disturbance Caused by Pipe Jacking: Measurement and Simulation of a Case Study
    Ma, Wenjie
    Wang, Binglong
    Wang, Xu
    Zhou, Shunhua
    Wang, Bolin
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (04) : 1467 - 1478
  • [43] Soil Layer Disturbance Caused by Pipe Jacking: Measurement and Simulation of a Case Study
    Wenjie Ma
    Binglong Wang
    Xu Wang
    Shunhua Zhou
    Bolin Wang
    KSCE Journal of Civil Engineering, 2021, 25 : 1467 - 1478
  • [44] Study on stability of soil around micro-tunnel construction using slurry pipe-jacking
    Shimada, H
    Sasaoka, T
    Kubota, S
    Matsui, K
    GEOTECHNICAL ENGINEERING MEETING SOCIETY'S NEEDS, VOLS 1 AND 2, PROCEEDINGS, 2001, : 425 - 429
  • [45] Discussion on the Waterproof and Drainage System of the Coastal Tunnel and Analysis of Water Pressure Law outside Lining: A Case Study of the Gongbei Tunnel
    Zhao, Jinpeng
    Tan, Zhongsheng
    Zhou, Zhenliang
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [46] Key aspects of a DN4000 steel pipe jacking project in China: A case study of a water pipeline in the Shanghai Huangpu River
    Wang, Jianfeng
    Wang, Kang
    Zhang, Tao
    Wang, Shuai
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 72 : 323 - 332
  • [47] A Novel Detection and Assessment Method for Operational Defects of Pipe Jacking Tunnel Based on 3D Longitudinal Deformation Curve: A Case Study
    Lin, Wei
    Li, Pan
    Xie, Xiongyao
    SENSORS, 2022, 22 (19)
  • [48] Ground surface movement of Shallow-Buried Large-Sectional tunnel under Full-Ring Pipe-Jacking roof and ground freezing
    Zhang, Dong-Mei
    Chen, Cong-Cen
    Zhang, Dong-Ming
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 127
  • [49] Ground surface movement of Shallow-Buried Large-Sectional tunnel under Full-Ring Pipe-Jacking roof and ground freezing
    Zhang, Dong-Mei
    Chen, Cong-Cen
    Zhang, Dong-Ming
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 127
  • [50] Case Study on the Interaction Between Rectangular Pipe Jacking Control and Ground Settlement in Silty Clay
    Mingyu Li
    Jinghui Yang
    Li Zeng
    Junwei Jin
    Yuhong Liu
    International Journal of Civil Engineering, 2023, 21 : 1447 - 1462