Cost comparison between GPS- and VHF-based telemetry: case study of feral cats Felis catus in New Zealand

被引:0
|
作者
Recio, Mariano R. [1 ,2 ]
Mathieu, Renaud [3 ]
Maloney, Richard [4 ]
Seddon, Philip J. [2 ]
机构
[1] Univ Otago, Sch Surveying, SERF, Dunedin, New Zealand
[2] Univ Otago, Dept Zool, Dunedin, New Zealand
[3] CSIR, NRE, Earth Observat Res Grp, ZA-0001 Pretoria, South Africa
[4] Dept Conservat, Christchurch, New Zealand
来源
NEW ZEALAND JOURNAL OF ECOLOGY | 2011年 / 35卷 / 01期
关键词
animal movements; project budget; spatial ecology; Tasman Valley; HABITAT;
D O I
暂无
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
Improvements in technology now make it possible to track animals of cat size using Global Positioning System (GPS)-telemetry. GPS technology has important advantages over traditional Very High Frequency (VHF)-radio tracking, but does incur higher per-tag costs. Budget is a limiting factor in experimental research; thus, an evaluation of the costs associated with both technologies according to the targets of a project should be undertaken before making any final decisions on the purchase of units and final experimental design. We simulated and compared the relative costs associated with the use of GPS and VHF telemetry applied to the study of the spatial ecology of feral cats (Fells catus) in the Tasman Valley (South Island, New Zealand) as a test case. We assessed different project durations and location acquisition rates. Cost analysis revealed that GPS-telemetry is the less expensive method to quantify the spatial ecology of feral cats when long-term (>1-year duration) projects and/or high acquisition rates (>1 location/day) are required.
引用
收藏
页码:114 / 117
页数:4
相关论文
共 22 条
  • [21] A comparison of results between interactive and non-interactive forms of visualisation to improve learning. A case study of Te Waihora/Lake Ellesmere, Canterbury, New Zealand
    Otinpong, B.
    Charters, S.
    McKinnon, A.
    Gidlow, B.
    21ST INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION (MODSIM2015), 2015, : 1916 - 1922
  • [22] The Importance of Lightweight Concrete Technology Development for IBS Industry in Malaysia Based on Cost Comparison between Concrete Slab and Hollow Core Slab: A Case Study of LRT Car Park Project
    Ramli, Mohd Zakwan
    Mahayudin, Harlina Mohd
    Hayder, G.
    Hafiz, Z. M.
    Daud, M.
    Salleh, A. M.
    STRUCTURAL, ENVIRONMENTAL, COASTAL AND OFFSHORE ENGINEERING, 2014, 567 : 637 - 641