共 50 条
- [41] Risk assessment in Tunnel Portal based on Fuzzy AHP Comprehensive Evaluation [J]. 2015 INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION, BIG DATA AND SMART CITY (ICITBS), 2016, : 692 - 696
- [42] Risk assessment of virtual enterprise based on the fuzzy comprehensive evaluation method [J]. INTEGRATION AND INNOVATION ORIENT TO E-SOCIETY, VOL 1, 2007, 251 : 58 - +
- [43] Application of fuzzy comprehensive evaluation to evaluate the effect of water flooding development [J]. Journal of Petroleum Exploration and Production Technology, 2018, 8 : 1455 - 1463
- [47] Application of fuzzy comprehensive evaluation method in engineering project risk management [J]. CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3087 - 3090
- [50] Analysis of Factors Influencing Floor Water Inrush in Coal Mines: A Nonlinear Fuzzy Interval Assessment Method [J]. Mine Water and the Environment, 2019, 38 : 81 - 92