Scheduling jobs to consider physiological factors

被引:16
|
作者
Oeztuerkoglu, Yuecel Yilmaz [1 ]
Bulfin, Robert L. [1 ]
机构
[1] Auburn Univ, Dept Ind & Syst Engn, Auburn, AL 36849 USA
基金
美国国家科学基金会;
关键词
Scheduling; Deteriorated jobs; Rate-modifying activity; Physiological factors; WORK;
D O I
10.1002/hfm.20257
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We studied scheduling jobs and breaks for a single worker. The processing time of jobs increases as the worker tires. In this study, we assume that conventional machine scheduling models do not always work for humans. So, while determining the break time, we consider the workers' physiological factors. The two objectives considered are the total flow time and makespan. An exact mathematical model and heuristic algorithm are developed to solve large problems. Numerical examples are presented for understanding and analyzing the performance of the mathematical model and the heuristic. (c) 2011 Wiley Periodicals, Inc.
引用
收藏
页码:113 / 120
页数:8
相关论文
共 50 条