共 50 条
- [44] Automated ground improvement process GEOTECHNICS OF SOFT SOILS: FOCUS ON GROUND IMPROVEMENT, 2009, : 399 - +
- [45] Research on trajectory planning method of automated tape laying and automated fiber placement for surfaces with holes Xiao, J. (j.xiao@nuaa.edu.cn), 1716, Chinese Society of Astronautics (34):
- [46] A nonparametric probabilistic method to enhance PGD solutions with data-driven approach, application to the automated tape placement process Advanced Modeling and Simulation in Engineering Sciences, 8