Coordinated ordering decisions for short life cycle products with uncertainty in delivery time and demand

被引:49
|
作者
Weng, ZK [1 ]
McClurg, T [1 ]
机构
[1] Univ Wisconsin, Sch Business, Madison, WI 53706 USA
关键词
supply chain coordination; order delivery contracts; newsvendor model;
D O I
10.1016/S0377-2217(02)00577-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a two-party system, in which the buyer orders a product from the supplier, whose delivery time is uncertain. The buyer is faced with random demand over a selling period of fixed length. The supplier aims to deliver the product at the start of the selling period, and if the delivery is late the buyer is compensated by the supplier. Our focus is on assessing the value and limitations of supplier-buyer coordination in coping with the uncertainty both in demand and delivery time. (C) 2002 Elsevier B.V. All rights reserved.
引用
收藏
页码:12 / 24
页数:13
相关论文
共 50 条
  • [41] Ordering, Pricing, and Lead-Time Quotation Under Lead-Time and Demand Uncertainty
    Wu, Zhengping
    Kazaz, Burak
    Webster, Scott
    Yang, Kum-Khiong
    PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (03) : 576 - 589
  • [42] Analogue-based demand forecasting of short life-cycle products: a regression approach and a comprehensive assessment
    Jose Basallo-Triana, Mario
    Rodriguez-Sarasty, Jesus Andres
    Dario Benitez-Restrepo, Hernan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (08) : 2336 - 2350
  • [43] Optimal ordering policy for short life-cycle products under credit financing with dynamic adoption in supply chain
    Chanda, Udayan
    Kumar, Alok
    JOURNAL OF MANAGEMENT ANALYTICS, 2019, 6 (03) : 269 - 301
  • [44] A MODEL FOR MAKING PART SOURCING DECISIONS FOR LONG LIFE CYCLE PRODUCTS
    Prabhakar, Varun J.
    Sandborn, Peter
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2011, VOL 9, 2012, : 929 - 937
  • [45] Optimal ordering method for short lifecycle products whose demand is dependent on day of the week
    Department of Management and Information Systems Science, Nagaoka University of Technology, Nagaoka, Niigata, 940-2188, Japan
    Journal of Japan Industrial Management Association, 2008, 58 (06) : 430 - 437
  • [46] A tool planning approach considering cycle time constraints and demand uncertainty
    Muh-Cherng Wu
    Yai Hsiung
    Hsi-Mei Hsu
    The International Journal of Advanced Manufacturing Technology, 2005, 26 : 565 - 571
  • [47] A tool planning approach considering cycle time constraints and demand uncertainty
    Wu, MC
    Hsiung, Y
    Hsu, HM
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (5-6): : 565 - 571
  • [48] Modeling process-switching decisions under product life cycle uncertainty
    Ramasesh, Ranga
    Tirupati, Devanath
    Vaitsos, Constantin A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 236 - 246
  • [49] Designing a firm's coordinated manufacturing and supply decisions with short product life cycles
    Parlar, M
    Weng, ZK
    MANAGEMENT SCIENCE, 1997, 43 (10) : 1329 - 1344
  • [50] On The Change of Cost Risk and Uncertainty throughout the Life Cycle of Manufacturing Products
    Schwabe, Oliver
    Erkoyuncu, John A.
    Shehab, Essam
    7TH CIRP GLOBAL WEB CONFERENCE - TOWARDS SHIFTED PRODUCTION VALUE STREAM PATTERNS THROUGH INFERENCE OF DATA, MODELS, AND TECHNOLOGY (CIRPE 2019), 2019, 86 : 239 - 244