Power efficient scheduling heuristics for energy conservation in computational grids

被引:8
|
作者
Aziz, Abdul [1 ]
El-Rewini, Hesham [2 ]
机构
[1] Natl Univ Comp & Emerging Sci FAST NU, Dept Comp Sci, Lahore, Pakistan
[2] Univ N Dakota, Sch Engn & Mines, Grand Forks, ND 58201 USA
来源
JOURNAL OF SUPERCOMPUTING | 2011年 / 57卷 / 01期
关键词
High performance computing; Energy conservation; Power aware computing; Grid computing; Scheduling algorithms;
D O I
10.1007/s11227-011-0559-7
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Computation grids and computational clouds are becoming increasingly popular in the organizations which require massive computational capabilities. Building such infrastructures makes a lucrative business case, thanks to availability of cheap hardware components and affordable software. Maintaining computational grids or cloud, however, require careful planning as in such dedicated environments, round-the-clock availability of workstations is very crucial. Ensuring uninterrupted availability, not only demands mechanism for failover redundancy but also results in constant power drainage. The tradeoff between the cost and the performance is the constant dilemma that the operations of the data centers face today. In this paper, we propose various heuristics for power-aware scheduling algorithms for scheduling jobs with dependent tasks onto the computational grid. We formulate the problem as a multi-objective function which results in various cost-performance tradeoffs each lying within the solution boundary.
引用
收藏
页码:65 / 80
页数:16
相关论文
共 50 条
  • [41] QoS-constrained List Scheduling Heuristics for parallel applications on grids
    Baraglia, Ranieri
    Ferrini, Renato
    Tonellotto, Nicola
    Ricci, Laura
    Yahyapour, Ramin
    [J]. PROCEEDINGS OF THE 16TH EUROMICRO CONFERENCE ON PARALLEL, DISTRIBUTED AND NETWORK-BASED PROCESSING, 2008, : 379 - +
  • [42] Evaluation of different initial solution algorithms to be used in the heuristics optimization to solve the energy resource scheduling in smart grids
    Sousa, Tiago
    Morais, Hugo
    Castro, Rui
    Vale, Zita
    [J]. APPLIED SOFT COMPUTING, 2016, 48 : 491 - 506
  • [43] An efficient greedy task scheduling algorithm for heterogeneous inter-dependent tasks on computational grids
    Srinivas, D. B.
    Hegde, Sujay N.
    Rajan, M. A.
    Krishnappa, H. K.
    [J]. INTERNATIONAL JOURNAL OF GRID AND UTILITY COMPUTING, 2020, 11 (05) : 587 - 601
  • [44] An efficient greedy task scheduling algorithm for heterogeneous inter-dependent tasks on computational grids
    Srinivas D.B.
    Hegde S.N.
    Rajan M.A.
    Krishnappa H.K.
    [J]. Srinivas, D.B. (dibbur.b.srinivas@gmail.com), 1600, Inderscience Publishers, 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (11): : 683 - 704
  • [45] Fair Execution Time Estimation scheduling in Computational Grids
    Dafouli, Eleni
    Kokkinos, Panagiotis
    Varvarigos, Emmanouel A.
    [J]. DISTRIBUTED AND PARALLEL SYSTEMS: IN FOCUS: DESKTOP GRID COMPUTING, 2008, : 93 - +
  • [46] A new approach to the job scheduling problem in computational grids
    Javad Akbari Torkestani
    [J]. Cluster Computing, 2012, 15 : 201 - 210
  • [47] A hyper-heuristic for adaptive scheduling in Computational Grids
    Xhafa, Fatos
    [J]. NEURAL NETWORK WORLD, 2007, 17 (06) : 639 - 656
  • [48] A hybrid metaheuristic algorithm for job scheduling on computational grids
    [J]. 1600, Slovene Society Informatika (37):
  • [49] Approximate Performance Analysis of Job Scheduling on Computational Grids
    Shan, Zhiguang
    Lin, Chuang
    [J]. PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE FOR YOUNG COMPUTER SCIENTISTS, VOLS 1-5, 2008, : 282 - +
  • [50] A GA(TS) Hybrid Algorithm for Scheduling in Computational Grids
    Xhafa, Fatos
    Gonzalez, Juan A.
    Dahal, Keshav P.
    Abraham, Ajith
    [J]. HYBRID ARTIFICIAL INTELLIGENCE SYSTEMS, 2009, 5572 : 285 - +