Power efficient scheduling heuristics for energy conservation in computational grids

被引:8
|
作者
Aziz, Abdul [1 ]
El-Rewini, Hesham [2 ]
机构
[1] Natl Univ Comp & Emerging Sci FAST NU, Dept Comp Sci, Lahore, Pakistan
[2] Univ N Dakota, Sch Engn & Mines, Grand Forks, ND 58201 USA
来源
JOURNAL OF SUPERCOMPUTING | 2011年 / 57卷 / 01期
关键词
High performance computing; Energy conservation; Power aware computing; Grid computing; Scheduling algorithms;
D O I
10.1007/s11227-011-0559-7
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Computation grids and computational clouds are becoming increasingly popular in the organizations which require massive computational capabilities. Building such infrastructures makes a lucrative business case, thanks to availability of cheap hardware components and affordable software. Maintaining computational grids or cloud, however, require careful planning as in such dedicated environments, round-the-clock availability of workstations is very crucial. Ensuring uninterrupted availability, not only demands mechanism for failover redundancy but also results in constant power drainage. The tradeoff between the cost and the performance is the constant dilemma that the operations of the data centers face today. In this paper, we propose various heuristics for power-aware scheduling algorithms for scheduling jobs with dependent tasks onto the computational grid. We formulate the problem as a multi-objective function which results in various cost-performance tradeoffs each lying within the solution boundary.
引用
收藏
页码:65 / 80
页数:16
相关论文
共 50 条
  • [1] Power efficient scheduling heuristics for energy conservation in computational grids
    Abdul Aziz
    Hesham El-Rewini
    [J]. The Journal of Supercomputing, 2011, 57 : 65 - 80
  • [2] A novel deadline and budget constrained scheduling heuristics for computational grids
    Yong Wang
    R. M. Bahati
    M. A. Bauer
    [J]. Journal of Central South University, 2011, 18 : 465 - 472
  • [3] A novel deadline and budget constrained scheduling heuristics for computational grids
    王勇
    R.M.BAHATI
    M.A.BAUER
    [J]. Journal of Central South University, 2011, 18 (02) : 465 - 472
  • [4] A novel deadline and budget constrained scheduling heuristics for computational grids
    Yong, Wang
    Bahati, R. M.
    Bauer, M. A.
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2011, 18 (02): : 465 - 472
  • [5] An "on/off" model for energy-efficient scheduling of workflow applications in computational grids
    Mika, Marek
    [J]. 2015 20TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2015, : 1006 - 1009
  • [6] Energy efficient scheduling strategies in Federated Grids
    Leal, Katia
    [J]. SUSTAINABLE COMPUTING-INFORMATICS & SYSTEMS, 2016, 9 : 33 - 41
  • [7] Energy-Efficient Lightpaths for Computational Grids
    Tafani, Daniele
    Kantarci, Burak
    Mouftah, Hussein T.
    McArdle, Conor
    Barry, Liam P.
    [J]. 2012 14TH INTERNATIONAL CONFERENCE ON TRANSPARENT OPTICAL NETWORKS (ICTON 2012), 2012,
  • [8] A two-phase heuristic for the energy-efficient scheduling of independent tasks on computational grids
    Pinel, Frederic
    Dorronsoro, Bernabe
    Pecero, Johnatan E.
    Bouvry, Pascal
    Khan, Samee U.
    [J]. CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2013, 16 (03): : 421 - 433
  • [9] A two-phase heuristic for the energy-efficient scheduling of independent tasks on computational grids
    Frédéric Pinel
    Bernabé Dorronsoro
    Johnatan E. Pecero
    Pascal Bouvry
    Samee U. Khan
    [J]. Cluster Computing, 2013, 16 : 421 - 433
  • [10] Energy-Aware DPSO Algorithm for workflow Scheduling on Computational Grids
    Oukfif, Karima
    Bouali, Lyes
    Bouzefrane, Samia
    Boumghar, Fatima
    [J]. 2015 3RD INTERNATIONAL CONFERENCE ON FUTURE INTERNET OF THINGS AND CLOUD (FICLOUD) AND INTERNATIONAL CONFERENCE ON OPEN AND BIG (OBD), 2015, : 651 - 656