Assessment Processes to Increase the Burden of Existing Buildings Using BIM

被引:4
|
作者
Szelag, Romuald [1 ]
机构
[1] Bialystok Tech Univ, Wiejska 45A, PL-15351 Bialystok, Poland
关键词
MODEL;
D O I
10.1088/1757-899X/245/5/052067
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The process of implementation of the reconstruction of buildings is often associated with the need to adapt them to increased loads. In the restricted access to the archive project documentation it is necessary to use technical solutions to obtain a fairly short period of time necessary to implement the technical parameters of such processes. Dissemination of BIM in the design process can also be used effectively in the processes of identification of existing facilities for the implementation of the work of strengthening or adapting objects to the increased load requirements. Obtained in the process of research and macroscopic data is then used in the processes of numerical processing aimed at developing a numerical model reflects the actual parameters of the structure of the existing structure and, therefore, allows a better look at the object and the execution of the process to strengthen future. This article will identify possibilities for the use of BIM in processes of identification technology buildings and structures and indicated the necessary data to be obtained during the preliminary work. Introduced in model solutions enable the use of multi-criteria analysis of the choice of the most optimal solutions in terms of costs or expenditures of time during the process of construction. Taking the above work by building a numerical model of the object allows every step of verification by authorized person inventoried solutions and enables tracking and changes in the situation of those found derogations in relation to the parameters established at the primary stage. In the event of significant deviations, there is the possibility of rapid changes to the completed process of calculation and presentation of alternative solutions. Availability software using BIM technology is increasingly common here knowledge of the implementation of such solutions will become in a short time, the standard for most objects or engineering structures. The use of modern solutions using the described processes will be discussed on the example of an industrial facility where there was a need for installation of new equipment and adapt it to the technical parameters.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Using BIM to Retrofit Existing Buildings
    Khaddaj, Maggie
    Srour, Issam
    [J]. ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 1526 - 1533
  • [2] BIM to BREEAM: A workflow for automated daylighting assessment of existing buildings
    Dubljevic, Sanja
    Tepavcevic, Bojan
    Stefanovic, Aleksandra
    Andelkovic, Aleksandar S.
    [J]. ENERGY AND BUILDINGS, 2024, 312
  • [3] BIM for Existing Buildings: Potential Opportunities and Barriers
    Hossain, M. A.
    Yeoh, J. K. W.
    [J]. 2018 3RD INTERNATIONAL CONFERENCE ON BUILDING MATERIALS AND CONSTRUCTION (ICBMC 2018), 2018, 371
  • [4] Interactions of Sustainability and BIM in Support of Existing Buildings
    Ebrahimi, Pedram Razavi
    Alizadehsalehi, Sepehr
    Mosaberpanah, Mohammad Ali
    [J]. INTERNATIONAL CONFERENCE ON SUSTAINABLE INFRASTRUCTURE 2019: LEADING RESILIENT COMMUNITIES THROUGH THE 21ST CENTURY, 2019, : 216 - 225
  • [5] Assessment of existing buildings using Bayesian causal network
    Holicky, M
    Vorlícek, M
    Witzany, J
    [J]. SAFETY AND RELIABILITY, VOLS 1 & 2, 1999, : 719 - 724
  • [6] Using BIM for the assessment of the seismic performance of educational buildings
    Angulo, Carmen
    Díaz, Karen
    Gutiérrez, José M.
    Prado, Andrea
    Casadey, Rosanna
    Pannillo, Gino
    Rivera, Felipe Muñoz-La
    Herrera, Rodrigo F.
    Vielma, Juan C.
    [J]. International Journal of Safety and Security Engineering, 2020, 10 (01): : 77 - 82
  • [7] Assessment of Existing Concrete Buildings
    Nobile, L.
    Bonagura, M.
    Bartolomeo, V.
    [J]. ADVANCES IN FRACTURE AND DAMAGE MECHANICS X, 2012, 488-489 : 739 - 742
  • [8] BIM modeling of existing buildings - a study on effort and efficiency
    Marx, Peter
    Teferle, Felicia Norma Rebecca
    Thewes, Andreas
    Schaefer, Markus
    [J]. BAUTECHNIK, 2024, 101 (08) : 453 - 461
  • [9] BIM interoperability in the maintenance planning process for existing buildings
    Inojosa L.S.P.
    Vilanova K.A.
    [J]. Journal of Building Pathology and Rehabilitation, 2023, 8 (1)
  • [10] Practical Aspects of the Use BIM Technology for Existing Buildings
    Szelag, Romuald
    [J]. 3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471