The multiple resource constrained project scheduling problem: A breadth-first approach

被引:23
|
作者
Nazareth, T [1 ]
Verma, S [1 ]
Bhattacharya, S [1 ]
Bagchi, A [1 ]
机构
[1] Indian Inst Management, Calcutta 700027, W Bengal, India
关键词
project scheduling; resource constraint; breadth-first search; best-first search;
D O I
10.1016/S0377-2217(97)00402-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We describe a simple breadth-first tree search scheme for minimizing the makespan of a project consisting of a partially ordered network of activities under multiple resource constraints. The method compares quite favourably with existing techniques that employ depth-first or best-first search; in particular, it is able to solve optimally on a Pentium PC running SCO UNIX the entire set of 680 benchmark problems (First Lot: 480, Second Lot: 200) generated by Kolisch et al., 1995, The new algorithm has also been checked out experimentally on additional random test problems at graded levels of difficulty that were generated using two parameters: the threshold, which determined the predecessors of an activity, and the total resource availability of each resource type. The breadth-first scheme can be modified quite readily to do best-first search or to minimize measures other than makespan such as mean flow time and maximum tardiness. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:347 / 366
页数:20
相关论文
共 50 条
  • [1] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [2] A Tabu Search Approach for the Resource Constrained Project Scheduling Problem
    Paul R. Thomas
    Said Salhi
    [J]. Journal of Heuristics, 1998, 4 : 123 - 139
  • [3] A tabu search approach for the resource constrained project scheduling problem
    Thomas, PR
    Salhi, S
    [J]. JOURNAL OF HEURISTICS, 1998, 4 (02) : 123 - 139
  • [4] Crossing Rivers Problem Solution with Breadth-First Search Approach
    Ratnadewi, R.
    Sartika, E. M.
    Rahim, R.
    Anwar, B.
    Syahril, M.
    Winata, H.
    [J]. 2ND ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE (AASEC 2017), 2018, 288
  • [5] A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption
    Xu, Jiaojiao
    Bai, Sijun
    [J]. KYBERNETES, 2024, 53 (06) : 2007 - 2028
  • [6] A Boolean satisfiability approach to the resource-constrained project scheduling problem
    Horbach, Andrei
    [J]. ANNALS OF OPERATIONS RESEARCH, 2010, 181 (01) : 89 - 107
  • [7] A Boolean satisfiability approach to the resource-constrained project scheduling problem
    Andrei Horbach
    [J]. Annals of Operations Research, 2010, 181 : 89 - 107
  • [8] A resource constrained project scheduling problem with reattempt at failure: A heuristic approach
    Mori, M
    Tseng, CC
    [J]. JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) : 33 - 44
  • [9] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    [J]. ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [10] A lexicographic approach to the robust resource-constrained project scheduling problem
    Palacio, Juan D.
    Larrea, Olga L.
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2017, 24 (1-2) : 143 - 157