A project management approach to using simulation for cost estimation on large, complex software development projects

被引:8
|
作者
Mizell, Carolyn [1 ]
Malone, Linda [2 ]
机构
[1] NASA AA C2, Kennedy Space Ctr, Kennedy Space Ctr, FL 32899 USA
[2] Univ Cent Florida, Orlando, FL 32816 USA
来源
EMJ-ENGINEERING MANAGEMENT JOURNAL | 2007年 / 19卷 / 04期
关键词
software development; project management; cost estimation; discrete event simulation;
D O I
10.1080/10429247.2007.11431746
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An engineering manager can use this article to develop an approach to estimating cost and scheduling for large, complex software development projects that considers the inherent difficulties of developing accurate estimates for such projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This article provides an approach that uses a software development process simulation model that considers and conveys the level Of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits Of Such an approach.
引用
收藏
页码:28 / 34
页数:7
相关论文
共 50 条
  • [41] Time Estimation for Project Management Life Cycle: A Simulation Approach
    Suri, P. K.
    Bhushan, Bharat
    Jolly, Ashish
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2009, 9 (05): : 211 - 215
  • [42] Software Project Cost Estimation Based On Groupware
    Jin Yongqin
    Li Jun
    Lin Jianming
    Chen Qingzhang
    2009 WRI WORLD CONGRESS ON SOFTWARE ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 437 - +
  • [43] Cost and time project management success factors for information systems development projects
    Sanchez, Otavio Prospero
    Terlizzi, Marco Alexandre
    de Oliveira Cesar de Moraes, Heverton Roberto
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (08) : 1608 - 1626
  • [44] Overcoming the Challenges in Cost Estimation for Distributed Software Projects
    Ramasubbu, Narayan
    Balan, Rajesh Krishna
    2012 34TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING (ICSE), 2012, : 91 - 101
  • [45] COST MANAGEMENT IN PROJECTS : A THEORETICAL APPROACH TAKEN FROM THE BEST PRACTICES OF THE PROJECT MANAGEMENT INSTITUTE
    Oliveros Villegas, Miguel Angel
    Rincon de Parra, Haydee Cecilia
    VISION GERENCIAL, 2011, 10 (01): : 85 - 94
  • [46] QUALITY, TIME AND COST IN SOFTWARE DEVELOPMENT PROJECTS
    Luis Cantu-Mata, Jose
    Torres-Castillo, Fernando
    Akaraz-Corona, Sergio
    Banda-Munoz, Fernando
    INTERCIENCIA, 2018, 43 (10) : 707 - 710
  • [47] Development of a suitable project management approach for projects with parallel planning and execution
    Freitas, F.
    Silva, F. J. G.
    Campilho, R. D. S. G.
    Pimentel, C.
    Godina, R.
    30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1544 - 1550
  • [48] Increasing the accuracy of software development effort estimation using projects clustering
    Bardsiri, V. Khatibi
    Jawawi, D. N. A.
    Hashim, S. Z. M.
    Khatibi, E.
    IET SOFTWARE, 2012, 6 (06) : 461 - 473
  • [49] Effort Estimation in Incremental Software Development Projects Using Function Points
    Pow-Sang, Jose Antonio
    Imbert, Ricardo
    COMPUTER APPLICATIONS FOR SOFTWARE ENGINEERING, DISASTER RECOVERY, AND BUSINESS CONTINUITY, 2012, 340 : 458 - +
  • [50] Integrating materials management with project management of complex projects
    Dixit, Vijaya
    Srivastava, Rajiv Kumar
    Chaudhuri, Atanu
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2013, 10 (02) : 230 - 278