Scheduling the capacitated identical parallel machines problem: a new formulation with sequence-dependent setup costs and different due dates

被引:6
|
作者
Esmaelian, Majid [1 ]
Sobhani, Ahmad [2 ]
Shahmoradi, Hadi [1 ]
Mohammadi, Milad [1 ]
机构
[1] Univ Isfahan, Dept Management, Hezarjerib St,Azadi Sq, Esfahan, Iran
[2] Oakland Univ, Sch Business Adm, Dept Decis & Informat Sci, Rochester, MI 48063 USA
关键词
capacitated identical parallel machines; constrained vehicle routing problem; mixed integer linear programming; constraint programming; meta-heuristic algorithm; PARTICLE SWARM; TIME; TARDINESS; ALGORITHM; SHOP; EARLINESS; MAKESPAN; RULES; PSO;
D O I
10.1504/EJIE.2021.117337
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper schedules capacitated parallel machines of a real production system by considering different quantities of production and processing times required to complete customer orders. A new mixed linear programming model is developed according to the concept of constrained vehicle routing problems to have a complete schedule for machines by determining the sequence of both jobs and idle times for each machine. The optimisation model minimises the total cost of the production system, including tardiness, earliness and sequence-dependent setup costs. A constraint programming (CP) model and a meta-heuristic hybrid algorithm are also developed to compare their results with the mixed linear programming model. The numerical findings show that the total cost estimated by the mixed integer programming model is 10%-13% better (lower) than the ones estimated by the CP model and the meta-heuristic algorithm when small instances of the scheduling problem are solved. By increasing the size of the scheduling problem, the meta-heuristic algorithm shows the best computational performance estimating 11% better (lower) total cost compared with the CP model.
引用
收藏
页码:643 / 674
页数:32
相关论文
共 50 条
  • [1] Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
    Kang, S
    Malik, K
    Thomas, LJ
    [J]. MANAGEMENT SCIENCE, 1999, 45 (02) : 273 - 289
  • [2] The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    Gupta, D
    Magnusson, T
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (04) : 727 - 747
  • [3] A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    Almada-Lobo, Bernardo
    Oliveira, Jose F.
    Carravilla, Maria Antonia
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (04) : 1374 - 1376
  • [4] Scheduling unrelated parallel machines with sequence-dependent setup times
    Zeidi, Javad Rezaeian
    MohammadHosseini, Samir
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496
  • [5] Parallel Machines Scheduling with Sequence-Dependent Setup Times Constraints
    Hu, Dayong
    Yao, Zhenqiang
    [J]. ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2528 - 2531
  • [6] Scheduling jobs on parallel machines with sequence-dependent setup times
    Lee, YH
    Pinedo, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) : 464 - 474
  • [7] Scheduling unrelated parallel machines with sequence-dependent setup times
    Javad Rezaeian Zeidi
    Samir MohammadHosseini
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496
  • [8] An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines
    Anderson, Bradley E.
    Blocher, James D.
    Bretthauer, Kurt M.
    Venkataramanan, Munirpallam A.
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2013, 57 (3-4) : 483 - 493
  • [9] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Zne-Jung Lee
    Shih-Wei Lin
    Kuo-Ching Ying
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781
  • [10] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Lee, Zne-Jung
    Lin, Shih-Wei
    Ying, Kuo-Ching
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781