Full system decontamination at the Obrigheim nuclear power plant prior to decommissioning

被引:0
|
作者
Topf, Christian [1 ]
机构
[1] Areva NP GmbH, D-91301 Erlangen, Germany
来源
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In May 2005, the Obrigheim nuclear power station was decommissioned after 36 years of power operation. That same year, the EnBW utility commissioned Areva NP GmbH to conduct a feasibility study of systems decontamination (with regard to chemistry, process technology, and waste volumes) before the plant would be demolished. On the basis of that study and the references produced by Areva NP GmbH, specifically the successful systems decontamination of the Stade reactor prior to demolition, Areva NP GmbH was awarded the contract in 2006 to plan and carry out decontamination of the primary system and the major auxiliary systems of the Obrigheim nuclear power station. The article covers both the HP/CORD UV(R) decontamination technique employed and the objectives and technical execution of systems decontamination. The excellent results obtained in systems decontamination are described in detail. Another point covered in the article are the advantages of full systems decontamination as a central measure preceding demolition. The potential this offers for dose rate reduction in nuclear power plants in operation is indicated.
引用
收藏
页码:727 / +
页数:5
相关论文
共 50 条
  • [21] NUCLEAR-POWER PLANT DECONTAMINATION
    SEDOV, VM
    SENIN, EV
    NESTERENKO, AP
    ZAKHAROVA, EV
    SOVIET ATOMIC ENERGY, 1988, 65 (06): : 972 - 976
  • [22] DECONTAMINATION IN NUCLEAR-POWER-PLANT
    VICSEVNE, MM
    ENERGIA ES ATOMTECHNIKA, 1986, 39 (11): : 515 - 519
  • [23] INSERVICE INSPECTIONS OF PRIMARY COMPONENTS IN NUCLEAR-POWER PLANT OBRIGHEIM
    BODECKER, KW
    ATOMKERNENERGIE, 1977, 29 (02): : 145 - 148
  • [24] THE REPLACEMENT OF THE STEAM-GENERATORS AT OBRIGHEIM NUCLEAR-POWER PLANT
    SCHENK, H
    HUMMELER, A
    PICKEL, E
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 46 : 89 - 89
  • [25] CONTROL OF OBRIGHEIM NUCLEAR POWER STATION
    ALEITE, W
    LEPIE, G
    RAUSCHER, T
    ATOM & STROM, 1967, 13 (11-1): : 194 - +
  • [26] Status and development of nuclear power plant decommissioning technologies
    Ishikura, T
    SAFE DECOMMISSIONING FOR NUCLEAR ACTIVITIES, 2003, : 193 - 213
  • [27] NUCLEAR-POWER PLANT DECOMMISSIONING COST RECOVERY
    KRAFT, SP
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 38 (JUN): : 138 - 139
  • [28] CONTAMINATION SPREAD DURING DECOMMISSIONING OF A NUCLEAR POWER PLANT
    Bonavigo, Lucia
    De Salve, Mario
    Zucchetti, Massimo
    Annunziata, Daniela
    FRESENIUS ENVIRONMENTAL BULLETIN, 2010, 19 (10B): : 2444 - 2448
  • [29] A new business model for decommissioning nuclear power plant
    Watson, Bruce A.
    IAEA Bulletin, 2023, 64 (01):
  • [30] ASPECTS ON DECOMMISSIONING OF THE GREIFSWALD NUCLEAR-POWER-PLANT
    VOLKMANN, B
    LOSCHHORN, U
    NUCLEAR ENGINEERING AND DESIGN, 1995, 159 (2-3) : 117 - 121