摘要
Ageing of power network assets and increasing demand challenge the utilities to economically and securely utilise the assets. The challenge of effective utilisation of assets becomes worse under unfavourable thermal conditions, which is the case of underground power cables crossing a road. There are occasions that higher conductor temperatures (10-20 degrees C) can be developed, with a negative effect on cable's life and failure risks when no remedial actions are taken. One common practice is cable de-rating, however, sacrificing cable's power capacity. At present, the negative impact of the unfavourable conditions and of de-rating strategies has not been addressed holistically. Hence, the combining effect on failure risks and adequacy is not effectively optimised. To address this gap and quantify the impact of hot spots on networks with various cable designs, this work integrates the thermal modelling of cable's hot spots and their associated risk of failure into a unified network reliability analysis framework. The methodology is demonstrated in a modified IEEE 14-bus network, to allow the inclusion of cable hot spots. It is found that the system performance with no remedial actions on hot spots is significantly weakened. An optimal de-rating hot spot strategy by 44% to 70% is more effective instead of complete negation (i.e. 100% de-rating factor). This proposed factor considers the holistic network-asset aspects of system adequacy, ageing and failures.
引用
收藏
页数:6
相关论文
共 50 条
  • [22] SELECTING EQUIPMENT FOR ECONOMY AND RELIABILITY - REDUCING UNDERGROUND CABLE COSTS
    HOLLINGSWORTH, PM
    ELECTRICAL REVIEW, 1971, 189 (21): : 740 - +
  • [23] Modeling Grouped Failures in Network Reliability Analysis
    Khapugin, Stepan
    Rodionov, Alexey S.
    ACM IMCOM 2015, PROCEEDINGS, 2015,
  • [24] A Reliability Model with the Dependent Failures for Telecommunication Network
    Chen, Weiwei
    Huang, Ning
    Kang, Rui
    PROCEEDINGS OF 2009 8TH INTERNATIONAL CONFERENCE ON RELIABILITY, MAINTAINABILITY AND SAFETY, VOLS I AND II: HIGHLY RELIABLE, EASY TO MAINTAIN AND READY TO SUPPORT, 2009, : 1129 - 1132
  • [25] Reliability Analysis of A Satellite System Considering Common Cause Failures
    Zhou, Hang
    Yang, Yuanjian
    Huang, Hong-Zhong
    Liu, Yu
    Peng, Weiwen
    2012 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2012, : 55 - 58
  • [26] Reliability Improvement Allocation Method Considering Common Cause Failures
    Cao, Yingsai
    Liu, Sifeng
    Fang, Zhigeng
    Dong, Wenjie
    IEEE TRANSACTIONS ON RELIABILITY, 2020, 69 (02) : 571 - 580
  • [27] Reliability Analysis of Modern Substations Considering Cyber Link Failures
    Lei, Hangtian
    Singh, Chanan
    Sprintson, Alex
    2015 IEEE INNOVATIVE SMART GRID TECHNOLOGIES - ASIA (ISGT ASIA), 2015,
  • [28] System Reliability Modeling Considering Correlated Probabilistic Competing Failures
    Wang, Yujie
    Xing, Liudong
    Wang, Honggang
    Coit, David W.
    IEEE TRANSACTIONS ON RELIABILITY, 2018, 67 (02) : 416 - 431
  • [29] Reliability of IEC 61850 based substation communication network architecture considering quality of repairs and common cause failures
    Mathebula, Vonani Clive
    Saha, Akshay Kumar
    PROTECTION AND CONTROL OF MODERN POWER SYSTEMS, 2022, 7 (01)
  • [30] Reliability of IEC 61850 based substation communication network architecture considering quality of repairs and common cause failures
    Vonani Clive Mathebula
    Akshay Kumar Saha
    Protection and Control of Modern Power Systems, 2022, 7