Selection of New Projects Considering the Synergistic Relationships in a Project Portfolio

被引:1
|
作者
Ma, Ke [1 ]
Bai, Libiao [1 ]
Sun, Yichen [1 ]
Pan, Tong [1 ]
Shi, Victor [2 ]
Zhang, Yipei [1 ]
机构
[1] Changan Univ, Sch Econ & Management, Xian 710064, Peoples R China
[2] Wilfrid Laurier Univ, Lazaridis Sch Business & Econ, Waterloo, ON N2L 3C5, Canada
基金
中国国家自然科学基金;
关键词
deviation; project portfolio change; new projects selection; synergistic relationships; BALANCED SCORECARD; MANAGEMENT; UNCERTAINTY; SYSTEM; SIMULATION; SUCCESS; MODEL; OPTIMIZATION; REDUCTION; INDUSTRY;
D O I
10.3390/buildings12091460
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Multiple internal conflicts and external emergencies can occur when an enterprise implements a project portfolio (PP), making the PP inevitably deviate from the enterprise's strategic objectives. As a means of project portfolio change (PPC) that aims to align the PP with strategic objectives, adding new projects can compensate for this deviation. Furthermore, the synergistic relationships in the PP can significantly impact the achievement of the enterprise's strategic objectives. Therefore, this study presents a procedure for the selection of new projects that considers the synergistic relationships in the PP. First, the deviation between the PP and the enterprise's strategic objectives is identified. Second, the synergistic relationships between candidate new projects and the projects in the PP are analyzed, based on which a model of new project selection is built. Third, by comparing the model simulation results of the attainment of the strategic objectives of several PPs, the new projects that can best achieve these strategic objectives are added to the PP. This procedure is illustrated using a numerical example showing its applicability and efficacy. For academia, this study provides a theoretical framework for the selection of new projects. Moreover, the straightforward procedure can help manage PPs in business practice.
引用
收藏
页数:21
相关论文
共 50 条
  • [11] Project Portfolio Selection Considering Total Cost of Ownership in the Automobile Industry
    Lee, Seunghoon
    Lee, Young Hoon
    Choi, Yongho
    SUSTAINABILITY, 2019, 11 (17)
  • [12] Relationships between IT Project Portfolio risk and IT Project Portfolio health
    Wissenburg, Ruud
    Kusters, Rob
    Martin, Harry
    2023 IEEE 25TH CONFERENCE ON BUSINESS INFORMATICS, CBI, 2023, : 114 - 123
  • [13] PORTFOLIO SELECTION OF NEW PRODUCT PROJECTS: A PRODUCT RELIABILITY PERSPECTIVE
    Relich, Marcin
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2016, 18 (04): : 613 - 620
  • [14] Research on project portfolio selection problem considering project synergy under multiple mental accounts
    Han, Ruyue
    Zhao, Zhenyu
    Soft Computing, 2024, 28 (21) : 12655 - 12670
  • [15] Project Portfolio Selection Considering the Fuzzy Chance Constraint of Water Environmental Restoration
    Wu, Kaili
    Feng, Jingchun
    Li, Sheng
    Zhang, Ke
    Hu, Daisong
    WATER, 2023, 15 (13)
  • [16] DEVELOPING A PROJECT PORTFOLIO SELECTION MODEL FOR CONTRACTOR FIRMS CONSIDERING THE RISK FACTOR
    Abbasianjahromi, Hamidreza
    Rajaie, Hossein
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (06) : 879 - 889
  • [17] A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting
    RezaHoseini, Ali
    Ghannadpour, Seyed Farid
    Hemmati, Maryam
    JOURNAL OF CLEANER PRODUCTION, 2020, 269
  • [18] Uncertain Public R&D Project Portfolio Selection Considering Sectoral Balancing and Project Failure
    Li, Hongbo
    Chen, Rui
    Zhang, Xianchao
    SUSTAINABILITY, 2022, 14 (23)
  • [19] Project Portfolio Selection Considering Uncertainty: Stochastic Dominance-Based Fuzzy Ranking
    Wu, Liang-Hong
    Wu, Liangchuan
    Shi, Jianming
    Chou, Yang-Tai
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (07) : 2048 - 2066
  • [20] Optimization Study of Project Portfolio Selection Considering Resources Conversion Under Uncertain Conditions
    Liang Chang-yong
    Wang Yong-sheng
    Jiang Li-Ying
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 2, 2011, : 263 - 268