共 29 条
- [1] Study of the Operation of Synchronous Generator Voltage Regulator During the Creation of Post Blackout Start-up Path [J]. 2015 INTERNATIONAL CONFERENCE ON INFORMATION AND DIGITAL TECHNOLOGIES (IDT), 2015, : 239 - 243
- [2] Optimizing the Generator Start-up Sequence After a Power System Blackout [J]. 2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
- [4] A new solution to generators start-up sequence during power system restoration [J]. 2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 2845 - 2849
- [5] Soft start-up control method for inductively coupled power transfer system [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2024, 44 (10): : 186 - 192
- [6] An approach for optimal units start-up during bulk power system restoration [J]. LESCOPE 01: 2001 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2001, : 190 - 194
- [8] A New Sensorless Start-up Method of LCI system for Gas-Turbine [J]. 2015 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), 2015, : 6559 - 6564
- [9] Greedy Algorithm for Generator Start-Up Sequence Optimization in Power System Restoration Considering Transmission Path [J]. PROCEEDINGS OF 2019 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES EUROPE (ISGT-EUROPE), 2019,