A New Method of the Load Compensation Use During Creation of Post Blackout Start-up Path in Power System

被引:0
|
作者
Malkowski, Robert [1 ]
Losinski, Maciej [2 ]
Czapp, Stanislaw [1 ]
Kowalak, Robert [1 ]
机构
[1] Gdansk Univ Technol, Fac Elect & Control Engn, Narutowicza 11-12 St, PL-80233 Gdansk, Poland
[2] Zarnowiec Pumped Storage Power Plant, Control Engn & Relay Protect Dept, PL-84250 Czymanowo, Poland
关键词
Load compensation; power system analysis computing; power system experiment; power system restoration; voltage control;
D O I
10.5755/j01.eie.22.4.15907
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Process of power system restoration, especially after blackout, is very complicated logistically and technically. In order to restore thermal power plant in power system, as a source of power hydro power plant is commonly used. The distance between these power plants may be relatively high - even over 500 km. High voltage overhead transmission lines to connect the power plants during the creation of post blackout start-up path are switched on under no load condition. Relatively high value of natural reactive power of these lines makes that value of voltage at the end of the switched line may reach an unacceptable high level, in spite of application of typical algorithm of automatic voltage regulator of synchronous generator. In the paper a new method of effective use of load compensation during creation of post blackout start-up path is proposed. Theoretical assumptions and simulation results of an investigation are presented. An experiment performed in the Polish Power System is also described. This experiment proved that the method proposed by the authors is advisable. The method may be utilized by power system operators for power system restoration process in emergency conditions.
引用
收藏
页码:16 / 20
页数:5
相关论文
共 29 条
  • [1] Study of the Operation of Synchronous Generator Voltage Regulator During the Creation of Post Blackout Start-up Path
    Malkowski, Robert
    Czapp, Stanislaw
    Kowalak, Robert
    Losinski, Maciej
    [J]. 2015 INTERNATIONAL CONFERENCE ON INFORMATION AND DIGITAL TECHNOLOGIES (IDT), 2015, : 239 - 243
  • [2] Optimizing the Generator Start-up Sequence After a Power System Blackout
    Shen, Cong
    Kaufmann, Paul
    Braun, Martin
    [J]. 2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [3] Modeling of transient states in the start-up path during voltage and start-up power application
    Grzadzielski, Ireneusz
    Olejnik, Bartosz
    Zakrzewski, Mikolaj
    [J]. ARCHIVES OF ELECTRICAL ENGINEERING, 2019, 68 (04) : 749 - 769
  • [4] A new solution to generators start-up sequence during power system restoration
    Liu, Qiang
    Shi, Libao
    Zhou, Ming
    Li, Gengyin
    Ni, Yixin
    [J]. 2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 2845 - 2849
  • [5] Soft start-up control method for inductively coupled power transfer system
    Yang, Jixin
    Shi, Liming
    Yin, Zhenggang
    Fan, Manyi
    [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2024, 44 (10): : 186 - 192
  • [6] An approach for optimal units start-up during bulk power system restoration
    Ketabi, A
    Asmar, H
    Ranjbar, AM
    Feuillet, R
    [J]. LESCOPE 01: 2001 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2001, : 190 - 194
  • [7] Optimisation for unit restarting sequence considering decreasing trend of unit start-up efficiency after a power system blackout
    Gu, Xueping
    Liu, Wenxuan
    Sun, Cong
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2016, 10 (16) : 4187 - 4196
  • [8] A New Sensorless Start-up Method of LCI system for Gas-Turbine
    An, Hyunsung
    Han, Byung-Moon
    Cha, Hanju
    [J]. 2015 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), 2015, : 6559 - 6564
  • [9] Greedy Algorithm for Generator Start-Up Sequence Optimization in Power System Restoration Considering Transmission Path
    Zhang, Jian
    Wang, Dong
    Xu, Changqing
    Li, Changcheng
    Zhang, Ning
    [J]. PROCEEDINGS OF 2019 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES EUROPE (ISGT-EUROPE), 2019,
  • [10] A New Start-up Method for a Load Commutated Inverter for Large Synchronous Generator of Gas-Turbine
    An, Hyunsung
    Cha, Hanju
    [J]. JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2018, 13 (01) : 201 - 210