摘要
Optimal generators start-up strategy in the restorative control of a power system following a blackout is a complex, multi-stage decision optimization problem. A novel solution strategy involving the corresponding model and approach to this problem is presented in this paper. The aim of the method is to maximize the total MWh load served over a restoration period whilst considering the corresponding constraints. The proposed model is first discretized as a series of knapsack problems with respect to each time step. The classic backtracking search method is employed to solve those knapsack problems. Moreover, the optimal generators start-up solution procedure is illustrated as well. The proposed method, to some extent, can make the trade off between the simulation precision and the computing efforts better. Case studies based on a modified 15-generator test system as bench mark are carried out to demonstrate the effectiveness and validity of the proposed model and method.
引用
收藏
页码:2845 / 2849
页数:5
相关论文
共 50 条
  • [1] Start-up Sequence of Generators in Power System Restoration Avoiding The Backtracking Algorithm
    Liu, Chongru
    Wu, Minhao
    Deng, Yingsong
    [J]. 2013 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PES), 2013,
  • [2] Optimal strategy for units start-up during power system restoration
    Liu, Qiang
    Shi, Libao
    Zhou, Ming
    Li, Gengyin
    Ni, Yixin
    [J]. Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2009, 24 (03): : 164 - 170
  • [3] An approach for optimal units start-up during bulk power system restoration
    Ketabi, A
    Asmar, H
    Ranjbar, AM
    Feuillet, R
    [J]. LESCOPE 01: 2001 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2001, : 190 - 194
  • [4] Greedy Algorithm for Generator Start-Up Sequence Optimization in Power System Restoration Considering Transmission Path
    Zhang, Jian
    Wang, Dong
    Xu, Changqing
    Li, Changcheng
    Zhang, Ning
    [J]. PROCEEDINGS OF 2019 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES EUROPE (ISGT-EUROPE), 2019,
  • [5] Optimal Generator Start-Up Strategy for Bulk Power System Restoration
    Sun, Wei
    Liu, Chen-Ching
    Zhang, Li
    [J]. 2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [6] Optimal Generator Start-Up Strategy for Bulk Power System Restoration
    Sun, Wei
    Liu, Chen-Ching
    Zhang, Li
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (03) : 1357 - 1366
  • [7] Optimizing the Generator Start-up Sequence After a Power System Blackout
    Shen, Cong
    Kaufmann, Paul
    Braun, Martin
    [J]. 2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [8] Discussion on "Optimal Generator Start-Up Strategy for Bulk Power System Restoration"
    Lin, Z. Z.
    Wen, F. S.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (03) : 1712 - 1712
  • [9] Optimal Generator Start-Up Sequence for Bulk System Restoration With Active Distribution Networks
    Zhao, Jin
    Wang, Hongtao
    Wu, Qiuwei
    Hatziargyriou, Nikos D.
    Shen, Feifan
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (03) : 2046 - 2057
  • [10] Optimal generation units start-up sequence during restoration of power system considering network reliability using bi-level optimization
    Ketabi, Abbas
    Karimizadeh, Amin
    Shahidehpour, Mohammad
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 104 : 772 - 783