共 50 条
- [1] Start-up Sequence of Generators in Power System Restoration Avoiding The Backtracking Algorithm [J]. 2013 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PES), 2013,
- [2] Optimal strategy for units start-up during power system restoration [J]. Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2009, 24 (03): : 164 - 170
- [3] An approach for optimal units start-up during bulk power system restoration [J]. LESCOPE 01: 2001 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2001, : 190 - 194
- [4] Greedy Algorithm for Generator Start-Up Sequence Optimization in Power System Restoration Considering Transmission Path [J]. PROCEEDINGS OF 2019 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES EUROPE (ISGT-EUROPE), 2019,
- [5] Optimal Generator Start-Up Strategy for Bulk Power System Restoration [J]. 2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
- [7] Optimizing the Generator Start-up Sequence After a Power System Blackout [J]. 2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,