Optimal strategy for units start-up during power system restoration

被引:0
|
作者
Liu, Qiang [1 ]
Shi, Libao [2 ]
Zhou, Ming [1 ]
Li, Gengyin [1 ]
Ni, Yixin [2 ]
机构
[1] North China Electric Power University, Baoding 071003, China
[2] Tsinghua University, Shenzhen 518055, China
关键词
Restoration - Combinatorial optimization - Economic and social effects - Optimal systems - Problem solving;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:164 / 170
相关论文
共 50 条
  • [1] An approach for optimal units start-up during bulk power system restoration
    Ketabi, A
    Asmar, H
    Ranjbar, AM
    Feuillet, R
    LESCOPE 01: 2001 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2001, : 190 - 194
  • [2] Optimal Generator Start-Up Strategy for Bulk Power System Restoration
    Sun, Wei
    Liu, Chen-Ching
    Zhang, Li
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [3] Optimal Generator Start-Up Strategy for Bulk Power System Restoration
    Sun, Wei
    Liu, Chen-Ching
    Zhang, Li
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (03) : 1357 - 1366
  • [4] Discussion on "Optimal Generator Start-Up Strategy for Bulk Power System Restoration"
    Lin, Z. Z.
    Wen, F. S.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (03) : 1712 - 1712
  • [5] Closure to Discussion on "Optimal Generator Start-Up Strategy for Bulk Power System Restoration"
    Sun, Wei
    Liu, Chen-Ching
    Zhang, Li
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (03) : 1713 - 1713
  • [6] A parallel restoration strategy for power network considering the start-up process of thermal units
    Zhou, Min
    Liu, Yan
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2010, 35 (10): : 30 - 34
  • [7] A new solution to generators start-up sequence during power system restoration
    Liu, Qiang
    Shi, Libao
    Zhou, Ming
    Li, Gengyin
    Ni, Yixin
    2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 2845 - 2849
  • [8] Optimal generation units start-up sequence during restoration of power system considering network reliability using bi-level optimization
    Ketabi, Abbas
    Karimizadeh, Amin
    Shahidehpour, Mohammad
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 104 : 772 - 783
  • [9] Generator Start-Up Strategy for Power System Restoration Considering Interdependency With Natural Gas Transmission Network
    Zhang, Chengeng
    Xu, Yin
    Wang, Ying
    Kan, Jun
    Chen, Yue
    IEEE TRANSACTIONS ON SMART GRID, 2024, 15 (04) : 3499 - 3513
  • [10] Optimal Multi-objective Units Start-up Strategy Based on Greedy Algorithm
    Zhang, Bowen
    Shi, Libao
    Ni, Yixin
    Yao, Liangzhong
    Bazargan, Masoud
    2013 IEEE INTERNATIONAL CONFERENCE OF IEEE REGION 10 (TENCON), 2013,