Developments in risk-informed decision-making for nuclear power plants

被引:18
|
作者
Vesely, WE
Apostolakis, GE
机构
[1] WE Vesely & Associates, Powell, OH 43065 USA
[2] MIT, Dept Nucl Engn, Cambridge, MA 02139 USA
关键词
D O I
10.1016/S0951-8320(98)00036-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:223 / 224
页数:2
相关论文
共 50 条
  • [41] Risk-informed developments and comparisons for the safety related valves of Inservice Testing Program at Taiwan BWR and PWR nuclear power plants
    Ting, K.
    Li, Y. C.
    Chen, K. T.
    Chien, F. T.
    Li, G. D.
    Huang, S. H.
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2014, 117 : 70 - 75
  • [42] Risk-Informed Decision Making for High-Consequence Outcomes
    Smith, Curtis
    Vedros, Kurt
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION 2010, VOL 11, 2012, : 271 - 276
  • [43] Data-driven CBM tool for risk-informed decision-making in an electric arc furnace
    Fumagalli, Luca
    Cattaneo, Laura
    Roda, Irene
    Macchi, Marco
    Rondi, Maurizio
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (1-4): : 595 - 608
  • [44] Extending the application of risk-informed dam safety decision making
    Fiedler, W. R.
    Osmun, D. W.
    RISK ANALYSIS, DAM SAFETY, DAM SECURITY AND CRITICAL INFRASTRUCTURE MANAGEMENT, 2012, : 81 - 86
  • [45] Risk-informed simulation for sustainable product design decision making
    Enyoghasi, Christian
    Badurdeen, Fazleena
    SUSTAINABLE MANUFACTURING - HAND IN HAND TO SUSTAINABILITY ON GLOBE, 2020, 43 : 399 - 406
  • [46] Importance analysis in risk-informed decision-making of changes to Allowed Outage Times addressing uncertainties
    Martorell, S.
    Villamizar, M.
    Villanueva, J. F.
    Carlos, S.
    Sanchez, A. I.
    ADVANCES IN SAFETY, RELIABILITY AND RISK MANAGEMENT, 2012, : 2143 - 2151
  • [47] Wildland Firefighter Estimated Ground Evacuation Time Modeling to Support Risk-Informed Decision-Making
    Campbell, Michael J.
    Gannon, Benjamin M.
    Rahman, Obaidur
    Stratton, Richard D.
    Dennison, Philip E.
    FIRE-SWITZERLAND, 2024, 7 (08):
  • [48] Data-driven CBM tool for risk-informed decision-making in an electric arc furnace
    Luca Fumagalli
    Laura Cattaneo
    Irene Roda
    Marco Macchi
    Maurizio Rondi
    The International Journal of Advanced Manufacturing Technology, 2019, 105 : 595 - 608
  • [49] Risk-Informed Decision-Making for Predisaster Risk Mitigation Planning of Interdependent Infrastructure Systems: Case Study of Jamaica
    He, Xian
    Cha, Eun Jeong
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (04)
  • [50] Progress toward regulatory acceptance of risk-informed inspection programs for nuclear power plants.
    Hedden, OF
    Cowfer, CD
    NONDESTRUCTIVE EVALUATION OF UTILITIES AND PIPELINES, 1996, 2947 : 41 - 45