A stochastic programming model with endogenous and exogenous uncertainty for reliable network design under random disruption

被引:29
|
作者
Bhuiyan, Tanveer Hossain [1 ]
Medal, Hugh R. [1 ]
Harun, Sarah [2 ]
机构
[1] Univ Tennessee, Dept Ind & Syst Engn, Knoxville, TN 37996 USA
[2] Mississippi State Univ, Dept Comp Sci & Engn, Mississippi State, MS 39762 USA
关键词
Stochastic programming; Predictive modeling; Endogenous uncertainty; Infrastructure protection; Disruption intensity; INTERDICTION MEDIAN PROBLEM; MIXED-INTEGER PROGRAM; FACILITY LOCATION; BENDERS DECOMPOSITION; LOGISTICS NETWORKS; HUB INTERDICTION; PROTECTION; DISASTER; ROBUST; OPTIMIZATION;
D O I
10.1016/j.ejor.2020.02.016
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Designing and maintaining a reliable and efficient transportation network is an important industrial problem. Integrating infrastructure protection with the network design model is efficient as these models provide strategic decisions to make a transportation network simultaneously efficient and reliable. We studied a combined network design and infrastructure protection problem subject to random disruptions where the protection is imperfect and multi-level and the effect of disruption is imperfect. In this research, we modeled a resource-constrained decision maker seeking to optimally allocate protection resources to the facilities, and construct links in the network to minimize the expected post-disruption transportation cost (PDTC). We modeled the problem as a two-stage stochastic program with both endogenous and exogenous uncertainty: a facility's post-disruption capacity depends probabilistically on the protection decision, making the uncertainty endogenous, while the link construction decision directly affects the transportation decision. We implemented an accelerated L-shaped algorithm to solve the model and predictive modeling techniques to estimate the probability of a facility's post-disruption capacity for a given protection and disruption intensity. Numerical results show that solution quality is sensitive to the number of protection levels modeled; average reduction in the expected PDTC is 18.7% as the number of protection levels increases from 2 to 5. Results demonstrate that the mean value model performs very poorly as the uncertainty increases. Results also indicate that the stochastic programming model is sensitive to the estimation error of the predictive modeling techniques; on average the expected PDTC becomes 6.38% higher for using the least accurate prediction model. (C) 2020 Elsevier B.V. All rights reserved.
引用
收藏
页码:670 / 694
页数:25
相关论文
共 50 条
  • [41] Stochastic programming approach to optimization under uncertainty
    Shapiro, Alexander
    MATHEMATICAL PROGRAMMING, 2008, 112 (01) : 183 - 220
  • [42] A Two-stage Stochastic Programming for the Integrated Emergency Mobility Facility Allocation and Road Network Design Under Uncertainty
    Gong, Huatian
    Yang, Xiaoguang
    NETWORKS & SPATIAL ECONOMICS, 2024,
  • [43] A stochastic programming winner determination model for truckload procurement under shipment uncertainty
    Ma, Zhong
    Kwon, Roy H.
    Lee, Chi-Guhn
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (01) : 49 - 60
  • [44] Stochastic linear programming methods in limit load analysis and optimal plastic design under stochastic uncertainty
    Marti, K
    Stoeckl, G
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 2004, 84 (10-11): : 666 - 677
  • [45] Two-stage stochastic programming approach for gas allocation network under uncertainty
    Shukla, Gaurav
    Lim, Jeng Shiun
    Chaturvedi, Nitin Dutt
    JOURNAL OF CLEANER PRODUCTION, 2023, 426
  • [46] Network Design Model with Evacuation Constraints Under Uncertainty
    Nahum, Oren E.
    Hadas, Yuval
    Rossi, Riccardo
    Gastaldi, Massimiliano
    Gecchele, Gregorio
    19TH EURO WORKING GROUP ON TRANSPORTATION MEETING (EWGT2016), 2017, 22 : 489 - 498
  • [47] A stochastic multimodal reliable network design problem under adverse weather conditions
    Uchida, Kenetsu
    Sumalee, Agachai
    Ho, H. W.
    JOURNAL OF ADVANCED TRANSPORTATION, 2015, 49 (01) : 73 - 95
  • [48] Decomposition Based Stochastic Programming Approach for Polygeneration Energy Systems Design under Uncertainty
    Liu, Pei
    Pistikopoulos, Efstratios N.
    Li, Zheng
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (07) : 3295 - 3305
  • [49] Two-stage Stochastic Programming Formulation for Ship Design Optimisation under Uncertainty
    Diez, Matteo
    Peri, Daniele
    SHIP TECHNOLOGY RESEARCH, 2010, 57 (03) : 172 - 181
  • [50] A Dynamic Programming Algorithm for Reliable Network Design
    Elshqeirat, Basima
    Soh, Sieteng
    Rai, Suresh
    Lazarescu, Mihai
    IEEE TRANSACTIONS ON RELIABILITY, 2014, 63 (02) : 443 - 454