New Optimization Model for Multi-Period Multi-Product Production Planning System with Uncertainty

被引:3
|
作者
Mahmoud, Asmaa A. [1 ]
Aly, Mohamed F. [1 ]
Mohib, Ahmed M. [1 ]
Afefy, Islam H. [1 ]
机构
[1] Fayoum Univ, Fac Engn, Ind Engn Dept, Faiyum, Egypt
来源
关键词
Multi-Period; Multi-Product (MPMP); Process Manufacturing System (PMS); Two-Stage Stochastic Programming (TSP); Sampling Average Approximation (SAA);
D O I
10.7232/iems.2019.18.4.872
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The focus of this study is to develop a multi-period multi-product (MPMP) production planning system with uncertainty, and products demand (seasonal demand) uncertainty. Mainly, the problem aims reach the production levels of each product according to the uncertain demand for various periods, which depend on constraints of capacity, inventory, and resources. An analytical model proposed for this problem that can be categorized into two classes: non-linear and stochastic. The objective is to minimize the summation of variable production costs. As uncertain demand is a dynamic stochastic data process in the planning horizon, it is considered as a tree model. Each stage in the demand tree model is related to a cluster of a period time. Hence, depending on the tree model for the fluctuation demand; Two-Stage Stochastic Programming (TSP) model is presented as an alternative for all demand scenarios. In some of the reviewed articles validation of the analytical model were missing, while other studies were missing either manufacturing set up costs or assumptions of seasonal demand. Therefore, this study proposes TSP model using Sampling Average Approximation method (SAA) that is suitable for a production planning system in any manufacturing environment considering seasonal demand using optimization program (Lingo 16) to solve the mathematical model. Further, investigation of seasonal demand is performed using the multiplicative seasonal method, and the model validation was checked using Mathworks Matlab R2015a (64-Bit) considering manufacturing set up costs. Finally, some recommendations for future research are suggested.
引用
收藏
页码:872 / 883
页数:12
相关论文
共 50 条
  • [31] A robust optimization model for multi-product two-stage capacitated production planning under uncertainty
    Rahmani, Donya
    Ramezanian, Reza
    Fattahi, Parviz
    Heydari, Mandi
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (20-21) : 8957 - 8971
  • [32] A penalty-based scaling algorithm for the multi-period multi-product distribution planning problem
    Hosseini, S. Ahmad
    Sahin, Guvenc
    Unluyurt, Tonguc
    [J]. ENGINEERING OPTIMIZATION, 2017, 49 (04) : 583 - 596
  • [33] An Interval Programming Approach for Multi-period and Multi-product Aggregate Production Planning by Considering the Decision Maker's Preference
    Zhu, Bin
    Hui, Jizhuang
    Zhang, Fuqiang
    He, Li
    [J]. INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2018, 20 (03) : 1015 - 1026
  • [34] Sustainable Multi-Product Seafood Production Planning Under Uncertainty
    Simanjuntak, Ruth
    Sembiring, Monalisa
    Sinaga, Rani
    Pakpahan, Endang J.
    Mawengkang, Herman
    [J]. INTERNATIONAL CONFERENCE ON ADVANCEMENT IN SCIENCE AND TECHNOLOGY 2012 (ICAST): CONTEMPORARY MATHEMATICS, MATHEMATICAL PHYSICS AND THEIR APPLICATIONS, 2013, 435
  • [35] An Interval Programming Approach for Multi-period and Multi-product Aggregate Production Planning by Considering the Decision Maker’s Preference
    Bin Zhu
    Jizhuang Hui
    Fuqiang Zhang
    Li He
    [J]. International Journal of Fuzzy Systems, 2018, 20 : 1015 - 1026
  • [36] An integrated production and procurement design for a multi-period multi-product manufacturing system with machine assignment and warehouse constraint
    Vaziri, Shaghayegh
    Zaretalab, Arash
    Esmaeili, Mohammad
    Niaki, S. T. A.
    [J]. APPLIED SOFT COMPUTING, 2018, 70 : 238 - 262
  • [37] Multi-stage multi-product multi-period production planning with sequence dependent setups in closed-loop supply chain
    Torkaman, S.
    Ghomi, S. M. T. Fatemi
    Karimi, B.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 113 : 602 - 613
  • [38] Multi-Product Multi-Period Fixed Charge Transportation Problem: an Ant Colony Optimization Approach
    Panicker, Vinay V.
    Sarin, I. V.
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 1937 - 1942
  • [39] A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty
    Al-e-hashem, S. M. J. Mirzapour
    Malekly, H.
    Aryanezhad, M. B.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 134 (01) : 28 - 42
  • [40] A multi-product and multi-period aggregate production plan: a case of automobile component manufacturing firm
    Dohale, Vishwas
    Ambilkar, Priya
    Gunasekaran, Angappa
    Bilolikar, Vijay
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2022, 29 (10) : 3396 - 3425