Population learning algorithm for resource-constrained project scheduling

被引:0
|
作者
Jedrzejowicz, P [1 ]
Ratajczak, E [1 ]
机构
[1] Gdynia Maritime Acad, Chair Comp Sci, Gdynia, Poland
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper proposes applying the population-learning algorithm to solving a single mode resource constrained project scheduling problem with makespan minimization as an objective function. The paper contains problem formulation and a description of the proposed implementation of the population learning algorithm (PLA). To validate the approach a computational experiment has been carried. It has involved 1440 instances from the available benchmark data set. Experiment re suits show that the proposed PLA implementation is an effective tool for solving single mode resource constrained project scheduling problems. In a single run the algorithm has produced solutions with mean relative error value well below 1% as compared with available upper bounds for benchmark problems.
引用
收藏
页码:223 / 228
页数:6
相关论文
共 50 条
  • [31] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [32] A Teaching-Learning-Based Optimization Algorithm for the Resource-Constrained Project Scheduling Problem
    Joshi, Dheeraj
    Mittal, M. L.
    Kumar, Manish
    HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 1101 - 1109
  • [33] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [34] Deep Reinforcement Learning Approach for Resource-Constrained Project Scheduling
    Zhao, Xiaohan
    Song, Wen
    Li, Qiqiang
    Shi, Huadong
    Kang, Zhichao
    Zhang, Chunmei
    2022 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2022, : 1226 - 1234
  • [35] A dynamic population steady-state genetic algorithm for the resource-constrained project scheduling problem
    Cervantes, Mariamar
    Lova, Antonio
    Tormos, Pilar
    Barber, Federico
    NEW FRONTIERS IN APPLIED ARTIFICIAL INTELLIGENCE, 2008, 5027 : 611 - +
  • [36] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [37] A new algorithm for resource-constrained project scheduling with breadth and depth of skills
    Snauwaert, Jakob
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 292 (01) : 43 - 59
  • [38] A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem
    Proon, Sepehr
    Jin, Mingzhou
    NAVAL RESEARCH LOGISTICS, 2011, 58 (02) : 73 - 82
  • [39] Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling
    Bettemir, Onder Halis
    Sonmez, Rifat
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
  • [40] Effective genetic algorithm for resource-constrained project scheduling with limited preemptions
    Zhu, Jie
    Li, Xiaoping
    Shen, Weiming
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2011, 2 (02) : 55 - 65