A study of the treatment of a dangerous thick submerged rock mass in the three gorges reservoir area

被引:21
|
作者
Wang, Luqi [1 ,2 ]
Yin, Yueping [3 ]
Huang, Bolin [4 ]
Zhang, Zhihua [2 ]
Zhao, Peng [2 ]
Wei, Yunjie [3 ]
机构
[1] China Univ Geosci, Fac Engn, Wuhan 430074, Peoples R China
[2] Chongqing Bur Geol & Minerals Explorat, 208 Hydrogeol & Engn Geol Team, Chongqing 400700, Peoples R China
[3] China Inst Geol Environm Monitoring, Beijing 100081, Peoples R China
[4] China Three Gorges Univ, Hubei Key Lab Disaster Prevent & Mitigat, Yichang 443002, Peoples R China
关键词
Dangerous rock mass; The Three Gorges reservoir area; Dry-wet cycle; Preventative methods; BANK SLOPE; FAILURE; RIVER;
D O I
10.1007/s10064-020-01724-y
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In order to study the treatment of a dangerous thick submerged rock mass, the Jianchuandong dangerous rock mass (JDRM) in the Three Gorges reservoir area is analyzed in this paper. Field investigation, on-site monitoring, and laboratory testing were used to analyze the deformation and failure mode of the dangerous rock mass. The analysis shows that the uneven pressure caused by the weight and deterioration of the base of the rock mass during the dry-wet cycles will eventually lead to slump failure of the JDRM. Preventative methods, including anchoring the upper part of the dangerous rock mass and reinforcement of the base of the rock mass, are proposed to improve the stability of the dangerous rock mass. Based on a numerical simulation, we conclude that anchoring the upper dangerous rock mass can effectively control the deformation of the dangerous rock mass and reinforcement of the base of the rock mass can block the slip zone of the dangerous rock mass. The combination of these two preventative methods significantly improves the stability of the dangerous rock mass. By comparing the stability of the dangerous rock mass before and after the implementation of these preventative methods during the dry-wet cycles, it can be seen that the preventative methods can satisfactorily ensure the long-term stability of the dangerous rock mass.
引用
收藏
页码:2579 / 2590
页数:12
相关论文
共 50 条
  • [31] Landscape planning for a rural ecosystem: case study of a resettlement area for residents from land submerged by the Three Gorges Reservoir, China
    Guo, ZW
    Xiao, XM
    Gan, YL
    Zheng, YJ
    LANDSCAPE ECOLOGY, 2003, 18 (05) : 503 - 512
  • [32] Landscape planning for a rural ecosystem: case study of a resettlement area for residents from land submerged by the Three Gorges Reservoir, China
    Zhongwei Guo
    Xiangming Xiao
    Yaling Gan
    Yuejun Zheng
    Landscape Ecology, 2003, 18 : 503 - 512
  • [33] Slope reinforcement for housing in Three Gorges reservoir area
    Wu Faquan
    Luo Yuanhua
    Chang Zhonghua
    JOURNAL OF MOUNTAIN SCIENCE, 2011, 8 (02) : 314 - 320
  • [34] Slope reinforcement for housing in Three Gorges reservoir area
    Faquan Wu
    Yuanhua Luo
    Zhonghua Chang
    Journal of Mountain Science, 2011, 8
  • [35] Prediction of the Jiatanchang reservoir bank collapse in the three gorges reservoir area
    Zou, Linlin
    Nie, Lei
    Environmental Science and Engineering, 2013, 0 (9783642291067): : 595 - 601
  • [36] Slope Reinforcement for Housing in Three Gorges Reservoir Area
    WU Faquan1
    Journal of Mountain Science, 2011, 8 (02) : 314 - 320
  • [38] Water quality evaluation of the Three Gorges reservoir area
    Liu, Huijuan
    Qu, Jiuhui
    Huanjing Kexue/Environmental Science, 2002, 23 (01):
  • [39] The parametric study on stability of the landslide induced by water in the Three Gorges Reservoir Area
    Feng, Lipo
    Zheng, Yonglai
    Huang, Jihui
    GEOMECHANICS AND GEOTECHNICS: FROM MICRO TO MACRO, VOLS 1 AND 2, 2011, : 775 - 780
  • [40] Study of unsaturated hydraulic parameters of Huangtupo landslide in Three Gorges reservoir area
    Jian Wen-xing
    Xu Qiang
    Wu Han
    Tong Long-yun
    ROCK AND SOIL MECHANICS, 2014, 35 (12) : 3517 - 3522