Reliability analysis of shallow-buried tunnel construction adjacent to karst cave

被引:15
|
作者
Wu, Bo [1 ,4 ,5 ]
Sun, Wentao [1 ]
Cai, Ganwei [3 ]
Meng, Guowang [1 ,2 ]
机构
[1] Guangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Guangxi, Peoples R China
[2] Guangxi Univ, Key Lab Disaster Prevent & Struct Safety, Minist Educ, Nanning 530004, Guangxi, Peoples R China
[3] Guangxi Univ, Sch Mech Engn, Nanning 530004, Guangxi, Peoples R China
[4] East China Univ Technol, Sch Civil & Architectural Engn, Nanchang 330013, Jiangxi, Peoples R China
[5] Guangzhou City Construct Coll, Sch Architectural Engn, Guangzhou 510925, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
Tunnel construction; Karst cave; Limit analysis; Instability probability; FACE STABILITY; CIRCULAR TUNNELS; ROCK MASSES; MECHANISMS;
D O I
10.1016/j.compgeo.2022.104673
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, based on the upper-bound theorem of limit analysis and the reliability theory, the reliability performance function of the rock and soil mass around the tunnel and the karst cave should be constructed. Through Matlab software programming, the instability probability and reliability index of the rock and soil mass around the tunnel and the karst cave are calculated by applying the Monte Carlo method. Applying the method to practical engineering, the reliability of the rock and soil in each damage zone in the karst area is studied. The study shows that when the ratio of tunnel buried depth to tunnel diameter is greater than 2, the tunnel passes through the moderately weathered dolomite layer or the slightly weathered dolomite layer, the self-supporting capacity of the rock and soil mass in front of the tunnel face has been significantly enhanced. The stability of the rock and soil mass around the left side of the karst cave has been significantly enhanced when the ratio of the clear distance between the cave and the bottom of the tunnel to cave diameter is greater than 2.
引用
收藏
页数:12
相关论文
共 50 条
  • [11] Adjacent Shallow-Buried and Mined Tunnel Building Safety Assessment in Complex Surroundings
    Yang Bingming
    Liu Baoguo
    Dong Xiaoming
    Zhang Sulei
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 2085 - 2089
  • [12] Construction technology for a shallow-buried underwater interchange tunnel with a large span
    Shi, Chenghua
    Cao, Chengyong
    Lei, Mingfeng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 70 : 317 - 329
  • [13] Optimization and analysis of blasting construction of shallow-buried tunnel with small clear spacing in city
    Wu, Bo
    Lan, Yangbin
    Yang, Shisheng
    Wang, Shuaishuai
    Dai, Yichang
    Journal of Railway Science and Engineering, 2020, 17 (05) : 1201 - 1208
  • [14] Affects of construction parameters on a shallow-buried large-section tunnel
    Qu, Dongming
    Ding, Chunlin
    Hou, Mingzhang
    Li, Zhiqing
    Modern Tunnelling Technology, 2014, 51 : 263 - 268
  • [15] Dynamic Response Analysis of Super Shallow-Buried Rectangular Tunnel
    Su, Sanqing
    Yin, Tao
    Cao, Zhen
    Lei, Bin
    Liu, Zhao
    Lin, Wenxu
    Kuang, Anyuan
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [16] Infl uence Law of Structural Inclination for the Construction of Shallow-Buried Highway Tunnel
    Shi, Shao-Shuai
    Li, Shu-Cai
    Zhou, Zong-Qing
    Li, Li-Ping
    JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2014, 17 (04) : 333 - 343
  • [17] STUDY ON THE CONSTRUCTION AND FIELD MONITORING OF SPECIAL SECTIONS OF SHALLOW-BURIED METRO TUNNEL
    Wan, Wen
    Chen, Zhi
    CONTROLLING SEISMIC HAZARD AND SUSTAINABLE DEVELOPMENT OF DEEP MINES: 7TH INTERNATIONAL SYMPOSIUM ON ROCKBURST AND SEISMICITY IN MINES (RASIM7), VOL 1 AND 2, 2009, : 1031 - 1036
  • [18] Construction technology of shallow-buried and unsymmetrical-loaded section in Zhangjiashan tunnel
    Kui, Y. (yangkui620@126.com), 1600, E-Journal of Geotechnical Engineering (19 U):
  • [19] Study on Surface Vibration Characteristics of Composite Shallow-buried Tunnel Blasting Construction
    Wu, Bo
    Lan, Yangbin
    Peng, Yiyong
    Meng, Guowang
    Wei, Han
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [20] Analysis of stability of shallow-buried tunnel built by pipe-roof pre-construction method
    Li, Yong-Suo
    Zhang, Ke-Neng
    Huang, Chang-Bo
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (09): : 3646 - 3651