Grid scheduling by bilevel programming: a heuristic approach

被引:4
|
作者
Bianco, Lucio [1 ]
Caramia, Massimiliano [1 ]
Giordani, Stefano [1 ]
Mari, Renato [1 ]
机构
[1] Univ Roma Tor Vergata, Dipartimento Ingn Impresa, I-00133 Rome, Italy
关键词
grid computing; resource management; bilevel model; heuristic algorithm; RESOURCE-MANAGEMENT; MULTICRITERIA; HIERARCHY; MODEL;
D O I
10.1504/EJIE.2015.067450
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study the following grid scheduling problem. A set of independent tasks, submitted to a grid external scheduler (ES), has to be assigned to a set of grid computing sites, each one controlled by a local scheduler (LS), for their execution. With each task are associated a release date and a due-date. If the due-date is exceeded, a penalty cost proportional to the tardiness must be paid. If this cost is too high, the ES could prefer to reject the task paying a rejection cost. Indeed, the ES wants to minimise the total cost for rejecting or delaying tasks, while each LS wants to maximise the computational resource usage efficiency. Thus, the problem is modelled by means of bilevel programming, where the decisions of the ES is constrained by those of the LSs, and vice versa. We propose a heuristic algorithm to solve large size instances. Computational results are presented and discussed.
引用
收藏
页码:101 / 125
页数:25
相关论文
共 50 条
  • [21] A heuristic scheduling strategy for independent tasks on grid
    Zhang Jinquan
    Ni Lina
    Jiang Changjun
    [J]. EIGHTH INTERNATIONAL CONFERENCE ON HIGH-PERFORMANCE COMPUTING IN ASIA-PACIFIC REGION, PROCEEDINGS, 2005, : 588 - 593
  • [22] Heuristic scheduling schemes for a genomic application on the Grid
    Inoue, Y
    Koita, T
    Fukuda, A
    [J]. PDPTA '05: Proceedings of the 2005 International Conference on Parallel and Distributed Processing Techniques and Applications, Vols 1-3, 2005, : 244 - 248
  • [23] Interactive fuzzy goal programming approach for bilevel programming problem
    Arora, S. R.
    Gupta, Ritu
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (02) : 368 - 376
  • [24] An interval number programming approach for bilevel linear programming problem
    Abass, Samir A.
    [J]. INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, 5 (06) : 461 - 464
  • [25] A heuristic approach to bicriteria scheduling
    Köksalan, MM
    [J]. NAVAL RESEARCH LOGISTICS, 1999, 46 (07) : 777 - 789
  • [26] Heuristic approach for forecast scheduling
    Zaaraoui, Hind
    Altman, Zwi
    Ben Jemaa, Sana
    Altman, Eitan
    Jimenez, Tania
    [J]. 2018 IEEE WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE WORKSHOPS (WCNCW), 2018, : 31 - 36
  • [27] A Neurodynamic Optimization Approach to Bilevel Quadratic Programming
    Qin, Sitian
    Le, Xinyi
    Wang, Jun
    [J]. IEEE TRANSACTIONS ON NEURAL NETWORKS AND LEARNING SYSTEMS, 2017, 28 (11) : 2580 - 2591
  • [28] A bilevel programming approach to double optimal stopping
    Makasu, Cloud
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2014, 238 : 393 - 396
  • [29] A Neurodynamic Optimization Approach to Bilevel Linear Programming
    Qin, Sitian
    Le, Xinyi
    Wang, Jun
    [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2015, 2015, 9377 : 418 - 425
  • [30] Contact shape optimization: a bilevel programming approach
    J. Herskovits
    A. Leontiev
    G. Dias
    G. Santos
    [J]. Structural and Multidisciplinary Optimization, 2000, 20 : 214 - 221