Measurement of Construction BIM Value Based on a Case Study of a Large-Scale Building Project

被引:46
|
作者
Kim, Seongah [1 ]
Chin, Sangyoon [1 ]
Han, Jintaek [2 ]
Choi, Cheol-Ho [3 ]
机构
[1] Sungkyunkwan Univ, Coll Engn, Sch Civil Architectural Engn & Landscape Architec, Seobu Ro 2066, Suwon 16419, South Korea
[2] Sungkyunkwan Univ, Grad Sch, Dept Convergence Engn Future City, Seobu Ro 2066, Suwon 16419, South Korea
[3] DoallTech Co Ltd, SK Ctr V1, 11,Dangsan Ro 41 Gil, Seoul 07217, South Korea
基金
新加坡国家研究基金会;
关键词
Building information modeling (BIM) value; Quantitative measurement; BIM issue; Issue analysis; Contract budget (CB);
D O I
10.1061/(ASCE)ME.1943-5479.0000551
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study proposes a quantitative measurement method for the value of building information modeling (BIM) implementation during the construction phase of a large-scale building project. From the case project, 472 value-assignable BIM issues were derived, and they were quantified regarding various aspects, such as the BIM utilization value and BIM contribution value, using a contract budget (CB). It was found that BIM has contributed to identifying and/or resolving issues whose contractual values are as much as 15.92% of the total direct cost of the project. In addition, a survey of trade contractors was conducted to determine how much they think BIM has contributed to their works, which is defined as the BIM sensible value. It was also shown that the higher utilization and contribution of BIM were accompanied by a higher sensible value, which trade contractors experienced regarding the cost reduction and construction period acceleration. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Contract administration practices on building information modelling (BIM)-based construction project - an exploratory study
    Alwee, Sharifah Nur Aina Syed
    Zolkafli, Umi Kalsum
    Salleh, Hafez
    FACILITIES, 2023, 41 (11/12) : 742 - 766
  • [33] Integration of a Large-scale Research Facility into the Grid: Case Study of a Real Project
    Tang, Junjie
    Ni, Fei
    Ponci, Ferdinanda
    Monti, Antonello
    2013 4TH INTERNATIONAL CONFERENCE ON CLEAN ELECTRICAL POWER (ICCEP): RENEWABLE ENERGY RESOURCES IMPACT, 2013, : 313 - 319
  • [34] The Method of Building Large-scale Flexible Coordinate Measurement Networks
    Zhao Da
    Yu Xiaofen
    Zhang Hongying
    Yang Enzhen
    2016 INTERNATIONAL CONFERENCE ON MATERIAL, ENERGY AND ENVIRONMENT ENGINEERING (ICM3E 2016), 2016, : 473 - 479
  • [35] Automated Data Verification in a Large-scale Citizen Science Project: a Case Study
    Yu, Jun
    Kelling, Steve
    Gerbracht, Jeff
    Wong, Weng-Keen
    2012 IEEE 8TH INTERNATIONAL CONFERENCE ON E-SCIENCE (E-SCIENCE), 2012,
  • [36] BIM as the New Sustainable Design-Construction Manager: Case Study of ALN Building Project Experience
    Pasha, Petrit
    Rasdi, Mohd Tajuddin Mohd
    Utaberta, Nangkula
    Yan, Xin
    Zhou, Yijiao
    ADVANCES IN CIVIL ENGINEERING MATERIALS, 2023, 310 : 125 - 138
  • [37] Collaborative design of large-scale building's energy saving structure based on green BIM concept
    Wang, Li
    Zhong, Jing
    Zhang, Peng
    INTERNATIONAL JOURNAL OF GLOBAL ENERGY ISSUES, 2022, 44 (2-3) : 217 - 232
  • [38] Lean Construction and BIM in the Value Chain of a Construction Company: A Case Study
    Osorio-Gomez, Cristian-Camilo
    Moreno-Falla, Maria-Jose
    Ospina-Alvarado, Angelica
    Ponz-Tienda, Jose-Luis
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 368 - 378
  • [39] A Progress Measurement Framework for Large-Scale Urban Construction Projects
    Jung, Minhyuk
    Ko, Sungjin
    Chi, Seokho
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (07) : 2188 - 2194
  • [40] A Progress Measurement Framework for Large-Scale Urban Construction Projects
    Minhyuk Jung
    Sungjin Ko
    Seokho Chi
    KSCE Journal of Civil Engineering, 2018, 22 : 2188 - 2194